12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mowater Talc MineGeneral DetailsAddressContact PersonMowater Talc MineM/s Puenzhi Export HouseSamtseTel No.: 17601345/05-365283Tshering DorjiPromoterTalc lumpsType of mineral minedStripping Ratio (Ore to Waste) 1:17Number of working days <strong>and</strong> Seasonal (180 days) <strong>and</strong> estimated annual production 1019 MTAnnual ProductionGeological/Mineable Reserve Estimated geological reserve 4130 MT <strong>and</strong> mineable reserve3300MTLeased Area <strong>and</strong> Period 7.6 hectares (2008 <strong>for</strong> 3 yrs)ObservationFor easier underst<strong>and</strong>ing, Mowater talc mine is divided into east <strong>and</strong> west side even though thearea fall within the same leased area.1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> Protective GearsWater, sanitation <strong>and</strong> First–Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of WidthDevelopment work was carried out from top–down <strong>and</strong>pit slop varies in-between 45 to 55 0 .Bench heights were maintained between 7 to 15meters.Bench widths were kept between 1.7 to 7.5meters.The eastern part of the mine lies at the base of the gullywhich is almost flat.The management has provided the workers withprotective gears which were limited to helmets only.First-aid-kit <strong>and</strong> bathroom facilities were not availableat the site.Natural spring was available at the eastern side of themine which was used <strong>for</strong> drinking purposes.The management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill in an identified waste dumpyardin the pit plan.Check dam made out of gabion wall was constructed atthe base of the dump-yard.Pit slope was between 50 to 55 0 <strong>and</strong> there was nobenching. The height of the overburden dumped wasabout 20 meters.45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!