12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentBiological Environment5. Approach/AccessRoad ConditionsWater Drainage System6. Environment <strong>and</strong>Progressive RestorationRestorationEnvironmental Bond7. OthersThe management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.Environment Bond deposited Nu. 6,00,000.0The management has constructed an approach road to themine area. The local people are emensely benifited bythe access road to the mine <strong>and</strong> the transportaion by thegypsum trucks.Environmental bond deposited Nu. 600,000.00No record shown <strong>for</strong> the deposition of the environmentalrestoration bond1.32 RecommendationConstruct check dam to arrest the OB at the present siteWater management program needs to be in placePushing of OB downhill has to be stopped <strong>and</strong> use the designated areaNeed to maintained the bench height & width as per the requirements85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!