Tenzin Stone Quarry, DrakarpoThis quarry is being operated based on the environmental clearance issued by the DGM.General DetailsAddressContact PersonTenzin Mining CompanyDawakhaTenzinType of mineral mined Slabs <strong>and</strong> bouldersStripping Ratio 0.06:1Operation <strong>and</strong> Annual 10 months in a year, 7,800 MTProductionGeological/Residual Reserve 0.195 Million MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period 0.85 hectaresObservation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>Safety:Safety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentOperation of the quarry has not followed the FMFS <strong>Report</strong>strictly. Hence the quarry phases were seen almost vertical.A few benches under development ranged from 6 to 18meters high <strong>and</strong> 3 to 6 meters wide.Other than helmets, the management had not provided anyother personal protective gears.Sanitation <strong>and</strong> water supply facilities were not provided atthe site.No first aid kit available at site. The management reportedthat in case of any workplace injury, people are being takento the nearby Basic Health Unit (BHU).The management has not provided disposal facilities <strong>for</strong>sanitary wastes.Top soil is not stored separately.The overburden <strong>and</strong> inter-burden have occupiedconsiderable area of the quarry though it is dumped at theapproved site. Moreover, the management has startedpushing the overburden down towards the highway.The height of overburden dumped above the highway is30.5 meters.Overburdens dumped above the highway have blocked thedrain <strong>and</strong> culvert.The only check dam which was under construction abovethe highway was dry wall.The management has not carried out monitoring of air,water <strong>and</strong> noise at the quarry site.There is a good vegetation cover around the mine.91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!