Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

QuarryLampathey Quartzite MineAddressContact PersonRaw Material <strong>and</strong> Final ProductStripping Ratio (Ore to Waste)Number of working days <strong>and</strong>Annual ProductionGeological/Residual ReserveLeased Area <strong>and</strong> PeriodObservation1. Mining Operation Design:Pit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentA<strong>for</strong>estationDevelopment work was carried top-down <strong>and</strong> pit slopevaries in-between 55 to 70 0 .Bench heights were maintained in between 3 to 6 meters.Bench widths were maintained between 2.8 to 5 meters.The management has provided the workers with protectivegears which were limited to helmets <strong>and</strong> breathing masksonly.Drinking water, first-aid-kit <strong>and</strong> pit latrine were availableat the mining site.The management has not provided disposal facilitates <strong>for</strong>sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill in an identified waste dump-yardin the pit plan.Pit slope was between 60-65 0 , no benching.The overburden inclusive of undersize <strong>and</strong> rejects weredisposed-off at the pre-determine site.Check dam made out of gabion wall was constructed atthe base of the dump-yard.The management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.The mine has been in operation <strong>for</strong> about 5years <strong>and</strong> noaf<strong>for</strong>estation is done.5. Approach/AccessRoad Conditions71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!