12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Height <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentBiological EnvironmentThere is good vegetation around the quarry.There are two streams above the quarry which there<strong>for</strong>eneeded proper protection <strong>and</strong> preservation.5. Approach/AccessRoad ConditionsWater Drainage System6. Environment <strong>and</strong>Progressive RestorationRestorationEnvironmental BondThe quarry had used the access road constructed by theNRDCL.There is a need <strong>for</strong> proper drains <strong>for</strong> channeling of surfacewater from the quarry.Currently no restoration works are done.Environment Bond still to be updated. (Record ofenvironmental restoration bond deposited by themanagement could not be confirmed since the responsiblepeople were not present during monitoring).7. Others There were no FMFS report <strong>and</strong> EnvironmentalManagement (EMP) at the site.Stone crusher was installed outside the demarcated area.Labour camps are constructed outside the demarcated area.Stone crusher was set up <strong>and</strong> operated withoutenvironmental clearance.1.43 RecommendationThe management should ensure that the quarry is operated strictly as per the FMFS report,EMP <strong>and</strong> environmental clearance at all times.The management should obtain separate environmental clearance <strong>for</strong> the operation of stonecrusher.The management should provide proper drains to channel out the water from the twonatural streams above the quarry.The overburden kept at the quarry is huge in volume. The management should there<strong>for</strong>eplan the management of the same if all of the accumulated overburdens can not be utilized<strong>for</strong> the hotel construction.Since the quarry will be used only <strong>for</strong> the duration of the hotel construction, themanagement should plan <strong>for</strong> the environmental restoration works.109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!