12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Khariphu Limestone MineGeneral DetailsAddressKuenphen Norden MiningKhasadrapchu, ThimphuContact PersonKuenzang GyeltshenManaging DirectorType of minerals mined. LimestoneStripping Ratio 0.11:1Operation <strong>and</strong> Annual Throughout the yearProductionGeological/Residual Reserve 2 Million MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period 23.8 hectares (1/4/2004 – 31/3/2014)Observation1. Mining Operation DesignPit Slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentBiological EnvironmentThe mine is still under development stageThe safety <strong>and</strong> personal protective gears provided to theworkers are inadequate. Since the work environment is verydusty, there is a need to enhance the provision of safety <strong>and</strong>personal protective gears.First-aid-kit is made available at the site office.Water <strong>and</strong> sanitation facilities provided. However, there areno proper toilets <strong>and</strong> sanitation facilities at the mining site<strong>and</strong> using the toilet at the base camp is very far.The management has not provided disposal facilitates <strong>for</strong>sanitary wastes.Top soils are not kept separately.The overburden inclusive of undersize/rejects <strong>and</strong> othermaterials are transported <strong>and</strong> disposed at approved dumpsite. However, some of the overburdens are found directlyrolled down into a gully which is not an approved dumpsite.Some of the overburdens/interburdens have rolled downwhile development of access road.89 meter length of dry wall has been constructed as checkdam at the overburden dump site.Since the work is still at the development stage, there are noproper mining benches <strong>and</strong> pit slopes maintained.The management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.A stream at the base of the mine has been affected byboulders rolled down during the development works.The mine area has thin vegetation comprising of grasses <strong>and</strong>76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!