12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cherung Ri Gypsum mineThe Cherung Ri Gypsum deposit is located adjacent to the Khothapa village in P/GatshelDzongkhag. It is located at distance of 110 km from S/Jongkhar, which is a prominent broder townin eastern Bhutan. Khothapa can be accessed via Tshelingor on the S/Jongkhar- Trashiganghighway.General DetailsAddressContact PersonCherung Ri Gypsum MineDruk Sater Corporation ltdP/GatshelTele No. 07-471114/471280General Manager (<strong>Mines</strong>)Type of minerals mined GypsumStripping Ratio 1.10:1Operation <strong>and</strong> Annual Operated though out the yearProductionGeological/Residual Reserve 8 million MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period Total leased area is 10.54 hectaresObservation:1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingSemi-mechanised opencast mining with rock breaker <strong>and</strong>limited blasting, with altimate bench maintaining (pitslope angle) to 40 degree horizontaly. The bench heightis maintained at 5.10 meters <strong>and</strong> width is 4.40 meters(max) <strong>and</strong> minimum height at 4.50 m <strong>and</strong> width at 4.20m.The mine is under development stage <strong>and</strong> it is fullymechanized <strong>and</strong> no workers were observed during thesite visit.The management has not stored the top soilThe OB is disposed downhill by a bulldozer. A checkdams will be constructed soon.84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!