12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentThe management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.The mine had been in operation <strong>for</strong> about 5months.5. Approach/AccessRoad ConditionsWater Drainage System6. Environment <strong>and</strong> ProgressiveRestorationRestorationEnvironmental BondA seasonal approach road to the mining area takes-offfrom Samtse-Sibsoo highway at Diana Bridge, whichis about 19 km.The approach road passes though the private l<strong>and</strong>be<strong>for</strong>e reaching the mining area.There is no side drain <strong>and</strong> cross drain to channel thesurface water.The progressive restoration was mostly focused onconstruction of check dam only.Environmental bond still to be updated.7. Others About 44 workers were employed.Diphujora village lies below the mine which was about100 meters aerial distance.A water supply pipeline passes from top of mine.1.16 RecommendationSince, the mine is located at the gully; any loose material could be easily washed away ifthere is a heavy down pour. This could also affect the village which lies at an aerialdistance of about 100 meters downstream. To prevent <strong>and</strong> avoid such incident, themanagement has to continue the construction of proper channeling of surface water <strong>and</strong>complete be<strong>for</strong>e the onset of monsoon.As maintained, the management should prevent from touching top portion of the minewhere drinking water supply line is connected.The management has to construct uni<strong>for</strong>m benches <strong>and</strong> widths as mentioned in the FMFS<strong>and</strong> EMP including waste dump-yard.The management has to provide sanitation facilities <strong>and</strong> first-aid –kit <strong>for</strong> the workers at thesite.Prior to the ceasing of the mining operation, the management should develop a projectproposal on environment restoration plan which is submitted to DGM <strong>and</strong> NECS <strong>for</strong>approval <strong>and</strong> execute the same as approved.48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!