12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ngabephu Stone QuarryThe quarry was specifically meant <strong>for</strong> the construction of Royal Thimphu College. Themanagement however reported that about 300 truck loads of material could have also been sold.The management had stopped operating the quarry since October 2008.General DetailsAddressContact PersonC/O Royal Thimphu College Construction OfficeNgabephu, ThimphuType of minerals mined. Construction stones (Quartzite)Stripping Ratio1:1 (as per FMFS <strong>Report</strong>)Operation <strong>and</strong> Annual 10, 000 MT (as per FMFS <strong>Report</strong>)ProductionGeological/Residual Reserve 145, 000 MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period 6.71 (2007-2017)Observation:1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidthThe quarrying seemed to have not followed the FMFS<strong>Report</strong> adequately.Attempts were made to operate the quarry from top down.Materials were extracted mainly by undercutting.The only bench used <strong>for</strong> extraction of materials measuredabout 21 meters high <strong>and</strong> 18 meters wide.Operation stopped.Top soil was not stored separately.The overburden was found to have been pushed downhillwhere natural regrowth of chrysanthemums <strong>and</strong> other shrubshave begun.The height of the dumped overburden was measured to be28 metersThe approved dump site <strong>for</strong> overburden was not utilized.86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!