12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Khotakpa Gypsum mineGypsum mining was started in the year 1983 after the establishment of Shumar Gypsum <strong>Mines</strong>with the objective of utilising the reserve <strong>for</strong> economic development of the area <strong>and</strong> optimisationof revenue to the government. The management of the project was taken over by Penden CementAuthority Ltd in the first quarters of 1986 <strong>and</strong> remained with them till August 1993.In keeping with the government policy of privatization of business <strong>and</strong> industrial venture, an areaof 26.77 hectares in Khothapa Gypsum mine, P/Gatshel was auction in September 1993. Thegypsum mining right was awarded to Druk Satair Corporation Ltd, <strong>for</strong> a bid value of Nu. 26.70million <strong>and</strong> given a lease period 10 years starting from 18 th Nov 1993.The mining rights of the mine were auction again on 21 st August 2003 <strong>and</strong> the same was own bythe company again <strong>for</strong> a further period of 15 years <strong>for</strong> a bid value Nu. 413.50 million. The nextlease period of the company will expire on 31 st Dec 2018.Druk Satair Corporation ltd is a limited company promoted by local investors comprising of sevenpromoters holding 35% of the equity in Oct 1993. The balance 65% equity is being held by thepublic of six eastern Dzongkhags <strong>and</strong> Central Monk Body.General DetailsAddressContact PersonKhotakpa Gypsum MineDruk Sater Corporation ltdP/GatshelTele No. 07-471114/471280General Manager (<strong>Mines</strong>)Type of minerals mined. GypsumStripping Ratio 1.10:1Operation <strong>and</strong> Annual Operated though out the yearProductionGeological/Residual Reserve 8 million MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period Total leased area is 26.77 hectares <strong>and</strong> it was auction <strong>for</strong> 15yearsObservation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsSemi- mechanised opencast mining with rock breaker<strong>and</strong> limited blasting, with altimate bench maintaining(pit slope angle) to 40 degree horizontaly. The benchheight is maintained at 10.00 meters <strong>and</strong> width is 8m(max) <strong>and</strong> minimum height at 5.70 m <strong>and</strong> width at 5 m.The management has provided the workers withprotective gears such as helmets, boot <strong>and</strong> dust mask.Drinking water <strong>and</strong> first-aid-kit are made available at thesite office.82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!