1.15 Simanadara Talc MineSimanadara Talc mine is located at Simanadara under Chengmari gewog, Samtse Dzongkhag. Themine fall as a part of the Toposheet no. 78F/1 which is about 18-20 KMs from Samtse. From thenearest highway, it is about 6-8KMs rough road along the Buduni Khola till the mining area.General DetailsAddressContact PersonSimanadara Talc MineNindah Export HouseSamtseTel. No.: 05-371042/371181Tsewang RinzinSite ManagerTalc lumpsType of mineral minedStripping Ratio (Ore to Waste) 1:5Number of working days <strong>and</strong> Seasonal (150 days) <strong>and</strong> estimated annual production 3600 MTAnnual ProductionGeological/Mineablel Reserve Estimated geological reserve 20, 000 MT <strong>and</strong> mineable reserve12, 000 MTLeased Area <strong>and</strong> Period 3.77 hectares (02/07/07-01/07/2010; 3Yrs)Observation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> Protective GearsWater, sanitation <strong>and</strong> First-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of WidthDevelopment work was carried out from top–down <strong>and</strong>pit slop varies in-between 45 to 55 0 .Bench heights were maintained between 5 to 7meters.Some bench widths were maintained between 2.2 to7.2meters whereas others are missing.The management has provided the workers withprotective gears which were limited to helmets only.Drinking water was available at the base camp butfirst-aid-kit <strong>and</strong> bathroom facilities were absent.The management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill in an identified waste dumpyardin the pit plan.Check dam made out of gabion wall was constructed atthe base of the dump-yard.Pit slope was between 55 to 60 0 <strong>and</strong> there was nobenching. The height of the overburden dumped wasabout 10 meters.47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!