12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sadhumardhu Talc MineSaddumardu Talc Mine is located Saddumardu on the left bank of the Pachu River which is about9 KMs from the Toorsa under Samtse Dzongkhag. The mine fall on the survey of BhutanToposahet No. 78 F/5.General DetailsAddressContact PersonSadhumardhu Talc MineM/s Singye Group of CompaniesPhuntsholingTel. No. 324152/324153/05251059TenzinSite ManagerTalc lumpsType of mineral minedStripping Ratio (Ore to Waste) 1:9Number of working days <strong>and</strong> Seasonal (180 days) <strong>and</strong> estimated annual production 2, 000 MTAnnual ProductionGeological/Mineable Reserve Estimated geological reserve 11,700 MT <strong>and</strong> mineable reserve 9,900 MTLeased Area <strong>and</strong> Period 3.58 hectares (08/10/07-07/10/2010; 3Yrs)Observation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> Protective GearsWater sanitation <strong>and</strong> First-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of WidthDevelopment work was carried out from top–down <strong>and</strong>pit slope varies in-between 60 to 75 0 .Bench heights were maintained between 11 to 30meters.Bench widths were kept at 4 meters on an average.However, in some areas benches were missing.The management has provided the workers withprotective gears which were limited to helmets only.Bathroom facilities <strong>and</strong> first-aid-kit were not availableat the mining site but drinking water was available.The management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill in an identified waste dumpyardin the pit plan.Check dam made out of gabion wall was underconstruction at the base of the dump-yard.49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!