Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Lower Kharipakha Talc MineLower Kharipakha Talc mine is located below the Kharipakha west. The approach road to themine is about 2 km from Daurpani Industrial area which passes from the base of the Kharikholastream. The waste dump-yard of Kharipakha mine is situated above the mine.General DetailsAddressContact PersonLower Kharipakha Talc MineM/s Eastern T.P. <strong>Mines</strong>SamtseTel No.17626090Tashi PhuntshoPromoter (17626090)Talc lumpsType of Mineral MinedStripping Ratio (Ore to Waste) 1:3Number of working days <strong>and</strong> Seasonal (180 days) <strong>and</strong> estimated annual production 1000 MTAnnual ProductionGeological/Mineable Reserve Estimated geological reserve 2990 MT <strong>and</strong> mineable reserve2540 MTLeased Area <strong>and</strong> Period 4.73 hectaresObservationDuring the time of monitoring, it was found that mine was not in operation.1. Mining Operation DesignDevelopment work was carried out from top–down <strong>and</strong>Pit slope Anglepit slope was ≤50 0 .Bench Height <strong>and</strong> Width Bench heights were maintained between 3.4 to 30.6meters.2. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of WidthBench width were at 40.6 metersThe management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill in an identified waste dumpyardin the pit plan.Check dam made out of gabion wall was constructed atthe base of the dump-yard.Overburdens were washed down causing siltationproblem of Khanarbarti-Kharikhola basin <strong>and</strong> rise inriver bed.5. Approach/AccessRoad ConditionsWater Drainage SystemA seasonal approach road measuring about 3 km,takes-off from Daurpani industrial area.There is no side drain <strong>and</strong> cross drain to channel thesurface water.43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!