12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Kharipakha East1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> Protective GearsWater, sanitation <strong>and</strong> First-Aid-Kit facilities3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of Width4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentBiological Environment5. Approach/AccessRoad ConditionsWater Drainage System6. Environment <strong>and</strong> ProgressiveRestorationRestorationEnvironmental BondDevelopment work was carried out from top–down <strong>and</strong>pit slope varies in-between 65-80 0 .Bench heights were maintained between 7 to 9meters.Bench widths were kept between 2 to 3meters.The management has provided the workers withprotective gears which were limited to helmets only.Drinking water, first-aid-kit <strong>and</strong> bathroom facilitieswere not available at the site.The management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill in an identified waste dumpyardin the pit plan.Check dam made out of gabion wall was constructed atthe base of the dump-yard.Overburdens were washed down causing siltationproblem of Khanarbarti-Kharikhola basin <strong>and</strong> rise inriver bed.Pit slope was between 65 to 80 0 <strong>and</strong> there was nobenching. The height of the overburden dumped wasabout 30 meters.The management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.The mine has been in operation <strong>for</strong> about six years <strong>and</strong>no af<strong>for</strong>estation activity was carry out in the mined outarea.A seasonal approach road measuring about 4 kmstakes-off from Daurpani industrial area.There was no side <strong>and</strong> cross drain to channel thesurface water.The progressive restoration was focused only onconstruction of check dams.7. Others A newly constructed farm road passes right below themine.About 200 hundred workers employed.Waste dump-yard was located above the farm road.Overburden from upper Kharipakha spills into41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!