Dhur Stone QuarryDhur Stone Quarry is leased out in the name of Aum Tshering Pem, Bumthang. However, it isbeing operated by Yugharling construction, Bumthang. Environmental clearance <strong>for</strong> the quarry hasbeen issued by the DGM. However, due to non-availability of FMFS <strong>Report</strong> at site, the area of thequarry could not be verified.General DetailsAddressContact PersonType of minerals minedStripping RatioOperation <strong>and</strong> AnnualProductionGeological/Residual Reserve<strong>and</strong> projected year to lastLease Area <strong>and</strong> PeriodObservation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchDhur Stone QuarryC/O Yugharling Construction, BumthangTempa ChophelConstruction materials (Quartzite)No FMFS <strong>Report</strong> to ascertain.No FMFS <strong>Report</strong> to ascertain.No FMFS <strong>Report</strong> to ascertain.No FMFS <strong>Report</strong> to ascertain.The quarry was not operated as per the requirements of theenvironmental terms <strong>and</strong> conditions.No benches were developed.So far materials had been extracted by undercutting ofrocks.The height of the undercut rock was found to be about 20meters high <strong>and</strong> pit slope was vertical.Safety boots <strong>and</strong> helmets were provided to workers.Water <strong>and</strong> sanitation facilities were provided at the site.Adequate first aid kit was maintained at the quarry site.The management had not provided disposal facilities <strong>for</strong>sanitary waste.Top soils were not stored separately.No check dam had been constructed at the waste disposalsite since overburden <strong>and</strong> wastes were not dumped at thedesignated dump site.Overburden <strong>and</strong> inter-burdens were kept at the quarry <strong>and</strong>were being transported to the Yugharling Hotel constructionsite to be used <strong>for</strong> construction works <strong>and</strong> not dumped at thedesignated dump site.108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!