12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Soilaykhola Talc Mine (Lease expired)General DetailsAddressContact PersonSoilaykhola Talc MineNob Export HouseDaurpani, SamtseTel. No. 05-340306BikramOffice AssistanceTalc lumps <strong>and</strong> finesRaw Material <strong>and</strong> Final ProductStripping Ratio (Ore to Waste) 1:5Number of working days <strong>and</strong> Seasonal (180 days) <strong>and</strong> estimated annual production 900MTAnnual ProductionGeological/Mineable Reserve Estimated mineable reserve 1800MTLeased Area <strong>and</strong> Period 1.65 hectares(21/02/06-20/02/2009); 3Yrs. lease expiredObservation1. Mining Operation DesignDevelopment work was carried out from top–down <strong>and</strong>Pit slope Anglepit slope varies in-between 60 to 80 0 .Bench Height <strong>and</strong> Width No benching.3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of Width4. Environmental AspectsAir EnvironmentWater EnvironmentNoise Environment5. Approach/AccessRoad ConditionsWater Drainage System6. Environment <strong>and</strong> ProgressiveRestorationRestorationEnvironmental BondThe management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill.Check dam made out of gabion wall was underconstruction at the base of the dump-yard.Pit slope was between 60 to 70 0 <strong>and</strong> there was nobenching. The height of the overburden dumped wasabout 20 meters.The management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.The mine has been in operation <strong>for</strong> more than 2 years<strong>and</strong> no af<strong>for</strong>estation activity was carried out.A seasonal approach road measuring about 5KMstakes-off from Daurpani industrial area.There was no side <strong>and</strong> cross drain to channel thesurface water.The progressive restoration was focused only onconstruction of check dams.Environment Bond deposited Nu. 1,50,000.07. Others A newly constructed farm road passes right below themine.There was no channeling of mine water.66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!