12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Lower Sukrety Talc Mine (Suspended)General DetailsAddressContact PersonType of Mineral MinedStripping Ratio (Ore to Waste)Number of working days <strong>and</strong>Annual ProductionGeological/Residual ReserveLeased Area <strong>and</strong> PeriodLower Sukrety Talc MineM/s Lam MiningSamtseMr. Sonam TobgayPromoterTalc lumpsSeasonal (180 days) <strong>and</strong> estimated annual production averages9.33 hectares (05/06/08-04/06/2009), SuspendedObservations1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of Width6. Environment <strong>and</strong> ProgressiveRestorationRestorationEnvironmental BondDevelopment work was carried out from top–downwhere pit slope varies in-between 70 to 85 0 .No benching.The management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.Overburden was disposed downhill.No check dam was seen at the site.Waste materials were washed down which hadcontributed to the siltation of the Sukrety River basinThe mine was left as it without any restoration.Environment Bond deposited Nu. 60,000.07. Others Water pipeline passes adjacent to the waste dump-yard<strong>and</strong> is connected to the Indian side.Sukrety River flow below the mine.At the adjacent side of the mine, huge l<strong>and</strong>slide hasoccurred measuring more than 100meters in height.A seasonal approach road passes though the base of theslide.1.21 RecommendationThe management has to construct uni<strong>for</strong>m bench <strong>and</strong> width height as mentioned in theFMFS <strong>and</strong> EMP including waste dump-yard to attain final pit slope of 45 0 .57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!