12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pachhulum Stone QuarryThe quarry was not in operation during the time of monitoring.General DetailsAddressContact PersonRaw Material <strong>and</strong> Final ProductStripping RatioOperation <strong>and</strong> AnnualProductionGeological/Residual Reserve<strong>and</strong> projected year to lastLease Area <strong>and</strong> PeriodObservation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentPachulum Stone Quarry, ThimphuTashi PhuntshoQuartzite (Construction materials)No FMFS <strong>Report</strong> to ascertain.No FMFS <strong>Report</strong> to ascertain.No FMFS <strong>Report</strong> to ascertain.3.66 hectaresQuarrying was not done as per the FMFS report.Vegetation on the approach road to the quarry whichindicated that the quarry was not in operation <strong>for</strong> quite sometime.The quarry had two benches at the top measuring 19 m x8.25 m <strong>and</strong> 7.7 m x 6.6m (height x width).The pit slope angles of the benches were not maintained.Since the quarry was not in operation at the time ofmonitoring, occupational safety <strong>and</strong> health issues could notbe assessed <strong>and</strong> verified.Top soils were not stored separately.No check dam was foundOverburden <strong>and</strong> inter-burdens were pushed down <strong>and</strong> sincethe quarry was not operational the proper dump site couldnot be verified.There is good vegetation around the quarry.No local stream sources in the quarry area.112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!