Compliance Monitoring Report for Mines and Quarries - National ...
Compliance Monitoring Report for Mines and Quarries - National ...
Compliance Monitoring Report for Mines and Quarries - National ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Pachhulum Stone QuarryThe quarry was not in operation during the time of monitoring.General DetailsAddressContact PersonRaw Material <strong>and</strong> Final ProductStripping RatioOperation <strong>and</strong> AnnualProductionGeological/Residual Reserve<strong>and</strong> projected year to lastLease Area <strong>and</strong> PeriodObservation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentPachulum Stone Quarry, ThimphuTashi PhuntshoQuartzite (Construction materials)No FMFS <strong>Report</strong> to ascertain.No FMFS <strong>Report</strong> to ascertain.No FMFS <strong>Report</strong> to ascertain.3.66 hectaresQuarrying was not done as per the FMFS report.Vegetation on the approach road to the quarry whichindicated that the quarry was not in operation <strong>for</strong> quite sometime.The quarry had two benches at the top measuring 19 m x8.25 m <strong>and</strong> 7.7 m x 6.6m (height x width).The pit slope angles of the benches were not maintained.Since the quarry was not in operation at the time ofmonitoring, occupational safety <strong>and</strong> health issues could notbe assessed <strong>and</strong> verified.Top soils were not stored separately.No check dam was foundOverburden <strong>and</strong> inter-burdens were pushed down <strong>and</strong> sincethe quarry was not operational the proper dump site couldnot be verified.There is good vegetation around the quarry.No local stream sources in the quarry area.112