Reshore coal mineThe Rishore coal mine is located near Rishore <strong>and</strong> Phomrang village, <strong>and</strong> about 5 km to the westof Deothang town. The advancement of the working face is towards the slope of three small ridgesclosed to each other facing south. No proper benches were made on those slopes <strong>and</strong> the team wastold that it was due to the limit in scope by the demarcation pillars being exactly at the crest ofthose slopes.General DetailsAddressContact PersonRehore Coal minesEastern Bhutan Coal CompanyS/JongkharTele No. 07-260281Mr. B.B.TamangGeneral Manager (<strong>Mines</strong>)CoalType of minerals minedStripping Ratio 1: 3 (1:4)Operation <strong>and</strong> AnnualProductionGeological/Residual Reserve<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period It was auction <strong>for</strong> 15 years in June 2004Operated though out the year, six month development <strong>and</strong> sixmonths productionObservation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofDue to the nature of the deposition of the coal the mine isnot carry out as per the FMFS report.Benches are maintained but are temporary in natureThe management has provided the workers withprotective gears such as helmets, boot <strong>and</strong> dust mask.Drinking water <strong>and</strong> first-aid-kit is made available at thesite office.A pit type toilet is made available at the mining site.The management has not stored the top soilThe OB is displaced downhill by the bulldozer at the predeterminesite. A check dams was constructed to arrest theOB.Pit slope was about 60 0 <strong>and</strong> bench height about 6 metersfrom the base.78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!