12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8. Observation of the Individual <strong>Mines</strong>Captive <strong>Mines</strong>A captive mines are those mines dedicated <strong>for</strong> the mineral processing industries. As per the <strong>Mines</strong><strong>and</strong> Mineral Management Regulation 2002, each industry shall have one mine <strong>for</strong> a particularindustry.8.1 Titi Limestone MineTiti Limestone mine started its operation in 1992 <strong>and</strong> it is a captive mine <strong>for</strong> Lhaki Cement Plant.The mine is located at Titi which is about 15 km from Gomtu <strong>and</strong> falls in the survey of IndianTopo-sheet no. 78F/1. The deposit is across India-Bhutan border <strong>and</strong> in between Pugli <strong>and</strong> Titiriver. The mine shares a common border with Pugli Limestone mine.General DetailsAddressContact PersonType of mineral minedStripping Ratio 1:4Operation <strong>and</strong> AnnualProductionGeological/Residual Reserve<strong>and</strong> projected year to lastLease Area <strong>and</strong> PeriodObservationTiti Limestone <strong>Mines</strong>C/o Lhaki CementGomtu, SamtseTel No. 05-371042/371181Mr. Manoj KumurGeneral Manager (<strong>Mines</strong>)Limestone.The mine is operated throughout the year, six months <strong>for</strong> minedevelopment <strong>and</strong> six months <strong>for</strong> production. The annualproduction is 65, 000 MT (metric ton). The production capacityis likely to increase to 2, 25, 000 MT per annum.Total mineable reserve is estimated at 1.33 million MT <strong>and</strong>Residual Reserve at 0.6 million MTThe lease area is 33.46 hectares <strong>and</strong> the lease period is <strong>for</strong> tenyears (22/08/06-21/08/2015)1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesThe mine is operated from top-down where the operatingbench pit slope varies in-between 55 to 70 0 .Bench heights are maintained between 3 to 6 meters.Bench widths are maintained between 2.8 to 5 meters.The management has provided the workers with protectivegears which are limited to helmets <strong>and</strong> breathing masks.Drinking water <strong>and</strong> first-aid-kit is available at the siteoffice.A pit latrine is available at the mining site.14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!