- Page 2 and 3:
6.1.10 Recommendation .............
- Page 5 and 6:
Environment Assessment of Existing
- Page 7 and 8:
3.2 Undersize materialsDuring the o
- Page 9 and 10:
6.1 Immediate Approach6.1.1 FMFS an
- Page 11 and 12:
lead to encroachment and may lead t
- Page 13 and 14:
FMFS report submitted by them. Howe
- Page 15:
First-Aid-Kit3. Waste and Overburde
- Page 18 and 19:
2. Occupational Health andSafetySaf
- Page 20 and 21:
Chuniakhola Dolomite MineThe Chunia
- Page 22 and 23:
Uttarey Limestone MineThe Uttarey L
- Page 24 and 25:
Kalapani Calc Tufa MineThe Kalapnai
- Page 26 and 27:
Tintalley Quartzite MineTintalley q
- Page 28 and 29:
There was no electricity at the bas
- Page 30 and 31:
Safety and ProtectiveGearsDrinking
- Page 32 and 33:
Tinpawa Qaurtzite MineTinpawa quart
- Page 34 and 35:
Pakchina Quartzite MinePakchina qua
- Page 36 and 37:
Omchina Quartzite MineOmchina quart
- Page 38 and 39:
Talc MinesTalc is chemically known
- Page 40 and 41:
The management has to ensure that b
- Page 42 and 43:
Kharikhola basin, which passes thro
- Page 44 and 45:
6. Environment and ProgressiveResto
- Page 46 and 47:
4. Environmental AspectsAir Environ
- Page 48 and 49:
4. Environmental AspectsAir Environ
- Page 50 and 51:
4. Environmental AspectsAir Environ
- Page 52 and 53:
1.18 RecommendationsThe management
- Page 54 and 55:
1.19 RecommendationsThe management
- Page 56 and 57:
1.20 RecommendationThe management h
- Page 58 and 59:
Restoration work was not carried ou
- Page 60 and 61:
Undersize/Rejects/OthermaterialsMec
- Page 62 and 63:
Thumkey Talc MineContact DetailsAdd
- Page 64 and 65:
Dipujhora Talc MineThe environmenta
- Page 66 and 67:
Soilaykhola Talc Mine (Lease expire
- Page 68 and 69: Allaypakha (Closed)General DetailsA
- Page 70 and 71: Pitsu Talc MineThe mine could not b
- Page 72 and 73: Water Drainage System6. Environment
- Page 74 and 75: Water EnvironmentNoise EnvironmentA
- Page 76 and 77: Khariphu Limestone MineGeneral Deta
- Page 78 and 79: Reshore coal mineThe Rishore coal m
- Page 80 and 81: Reshore coal mine no 5.Rishore Mine
- Page 82 and 83: Khotakpa Gypsum mineGypsum mining w
- Page 84 and 85: Cherung Ri Gypsum mineThe Cherung R
- Page 86 and 87: Ngabephu Stone QuarryThe quarry was
- Page 88 and 89: Geerza and Dojim Stone QuarryGeerza
- Page 90 and 91: There is an urgent need to construc
- Page 92 and 93: Noise EnvironmentBiological Environ
- Page 94 and 95: Noise EnvironmentBiological Environ
- Page 96 and 97: Noise EnvironmentBiological Environ
- Page 98 and 99: 5. Approach/AccessRoad ConditionsWa
- Page 100 and 101: Gidaphug Stone QuarryGeneral Detail
- Page 102 and 103: Kilikhar Stone QuarryGeneral Detail
- Page 104 and 105: Riju Stone Surface CollectionM/s Wa
- Page 106 and 107: Ghatak Stone QuarryGeneral DetailsA
- Page 108 and 109: Dhur Stone QuarryDhur Stone Quarry
- Page 110 and 111: Lamegonpa Stone QuarryLamegonpa Sto
- Page 112 and 113: Pachhulum Stone QuarryThe quarry wa
- Page 114 and 115: Thongtimo Stone QuarryThe quarry wa
- Page 116 and 117: 5. Approach/AccessRoad ConditionsWa
- Page 120 and 121: Water Drainage System6. Environment
- Page 122 and 123: Water Drainage System6. Environment
- Page 124 and 125: Water Drainage System6. Environment
- Page 126 and 127: Road ConditionsWater Drainage Syste
- Page 128 and 129: Water Drainage System6. Environment
- Page 130 and 131: MineDipujhora TalcMineSadhu MadhuTa
- Page 132 and 133: Talc MineExpired132
- Page 134 and 135: 7 Undersize and rejects• It was f
- Page 136: Kaleshore Limestone MineA mine was