12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Geerza <strong>and</strong> Dojim Stone QuarryGeerza <strong>and</strong> Dojim stone quarries measuring 40.02 hectares had been leased out to M/s BhutanStone <strong>and</strong> Aggregate Factory. Dojim stone quarry is currently not operating. There<strong>for</strong>e unlessspecified, the following observations are mostly <strong>for</strong> the Geerza stone quarry.General DetailsAddressContact PersonC/o Bhutan Stone <strong>and</strong> Aggregate FactoryNamselling, ThimphuDawa Norbu, ManagerType of mineral mined Construction materials (quartzite)Stripping Ratio 1:1Operation <strong>and</strong> Annual 8 months in a year, 180,000 MTProductionGeological/Residual Reserve 54.18 Million MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period 40.02 hectares (2007 – 2026)Observation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchA complete copy of FMFS report <strong>and</strong> EMP were kept at thesite office.Both quarries were not in operation.Geerza quarry is operated from top to bottom where theoperating pit slopes vary between 60 to 70 0 .Bench heights were maintained between 11 to 15 meters.Bench widths are maintained between 3.8 to 4 meters.The main working bench is about 100 meters.Personal protective gears such as safety helmets, breathingmasks, earmuffs <strong>and</strong> safety boots were provided to workers.Drinking water <strong>and</strong> first-aid-kit is made available at the siteoffice.Toilet is available at the mining site office. However, thereis no water supply <strong>and</strong> toilet at the quarry.Overburdens <strong>and</strong> interburdens were pushed downhill butinto the area below the quarry which the managementreported as the approved waste dump. However, in theabsence of a complete FMFS report, it could not be verified.A small concrete check dam has been constructed. Themanager, mines reported that as per the FMFS report, theyare required to construct a major check dam, 2440 metershigh <strong>and</strong> has been planned accordingly.Some overburdens were pushed downhill at areas other thanthe approved dump site.88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!