Compliance Monitoring Report for Mines and Quarries - National ...
Compliance Monitoring Report for Mines and Quarries - National ...
Compliance Monitoring Report for Mines and Quarries - National ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Geerza <strong>and</strong> Dojim Stone QuarryGeerza <strong>and</strong> Dojim stone quarries measuring 40.02 hectares had been leased out to M/s BhutanStone <strong>and</strong> Aggregate Factory. Dojim stone quarry is currently not operating. There<strong>for</strong>e unlessspecified, the following observations are mostly <strong>for</strong> the Geerza stone quarry.General DetailsAddressContact PersonC/o Bhutan Stone <strong>and</strong> Aggregate FactoryNamselling, ThimphuDawa Norbu, ManagerType of mineral mined Construction materials (quartzite)Stripping Ratio 1:1Operation <strong>and</strong> Annual 8 months in a year, 180,000 MTProductionGeological/Residual Reserve 54.18 Million MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period 40.02 hectares (2007 – 2026)Observation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchA complete copy of FMFS report <strong>and</strong> EMP were kept at thesite office.Both quarries were not in operation.Geerza quarry is operated from top to bottom where theoperating pit slopes vary between 60 to 70 0 .Bench heights were maintained between 11 to 15 meters.Bench widths are maintained between 3.8 to 4 meters.The main working bench is about 100 meters.Personal protective gears such as safety helmets, breathingmasks, earmuffs <strong>and</strong> safety boots were provided to workers.Drinking water <strong>and</strong> first-aid-kit is made available at the siteoffice.Toilet is available at the mining site office. However, thereis no water supply <strong>and</strong> toilet at the quarry.Overburdens <strong>and</strong> interburdens were pushed downhill butinto the area below the quarry which the managementreported as the approved waste dump. However, in theabsence of a complete FMFS report, it could not be verified.A small concrete check dam has been constructed. Themanager, mines reported that as per the FMFS report, theyare required to construct a major check dam, 2440 metershigh <strong>and</strong> has been planned accordingly.Some overburdens were pushed downhill at areas other thanthe approved dump site.88