12.07.2015 Views

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AppendicesAppendix Q – Information required to be <strong>in</strong>cluded<strong>in</strong> an <strong>asbestos</strong> control planInformation required to be <strong>in</strong>cluded <strong>in</strong> an <strong>asbestos</strong> control plan:1. A record to <strong>in</strong>dicate that the notification requirements have been metand that required documentation is kept at the workplace where the<strong>asbestos</strong> removal work is be<strong>in</strong>g performed.2. In relation to <strong>asbestos</strong>:• its location• <strong>in</strong> relation to ACM:– whether the ACM is friable or non-friable– the type of ACM– the condition of the ACM– the quantity of ACM proposed to be removed.3. The type of personal protective cloth<strong>in</strong>g and personal protective equipmentto be used, <strong>in</strong>clud<strong>in</strong>g respiratory protective equipment.4. Proposed risk control measures to be used to prevent release of airborne<strong>asbestos</strong> fibres from the area where the <strong>asbestos</strong> removal work is be<strong>in</strong>gperformed.5. If the area where the <strong>asbestos</strong> removal work is be<strong>in</strong>g performed <strong>in</strong> anegative air enclosure, details regard<strong>in</strong>g:• smoke test<strong>in</strong>g• negative air units.6. Details of decontam<strong>in</strong>ation procedures for:• persons perform<strong>in</strong>g the <strong>asbestos</strong> removal work• tools and equipment used for the <strong>asbestos</strong> removal work• non-disposable personal protective cloth<strong>in</strong>g and personal protectiveequipment.7. Method of disposal of:• <strong>asbestos</strong> waste• disposable personal protective cloth<strong>in</strong>g and personal protective equipment• the structure used to enclose the areas where the <strong>asbestos</strong> removal workis be<strong>in</strong>g performed.8. Adm<strong>in</strong>istrative controls to be implemented, <strong>in</strong>clud<strong>in</strong>g:• security• work practices.9. Methods of clean<strong>in</strong>g follow<strong>in</strong>g <strong>asbestos</strong> removal work.10. Names of persons engaged by the licence holder or person who commissionedthe work (as applicable) to conduct <strong>asbestos</strong> paraoccupational air monitor<strong>in</strong>g(if any) and to conduct the clearance <strong>in</strong>spection.114 <strong>Compliance</strong> code / <strong>Remov<strong>in</strong>g</strong> <strong>asbestos</strong> <strong>in</strong> <strong>workplaces</strong> <strong>WorkSafe</strong> <strong>Victoria</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!