12.07.2015 Views

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AppendicesCONTROL PLAN FOR ASBESTOS REMOVAL (Class B)DATE: __________________________Name of removalist (as shown <strong>in</strong> licence) Name/address of removal site___________________________________________________________________________________________________________________________________________________________________ Domestic Industrial School Public venueGENERAL/PRELIMINARY Notified <strong>WorkSafe</strong> Adjacent employers (if relevant) notified by person who commissioned work or removalist (domestic) Nom<strong>in</strong>ated supervisor assigned for job Person who commissioned work has notified people (ie other employees) <strong>in</strong> immediate and adjacent areas Copies of tra<strong>in</strong><strong>in</strong>g tickets available on site Copy of <strong>asbestos</strong> removalist licence available on site Copy of control plan available on site Copy of Division 5 audit obta<strong>in</strong>ed from person who commissioned the work Equipment (HEPA vacuum/respirators) ma<strong>in</strong>ta<strong>in</strong>ed/checked and records/logs kept1. Non-friable <strong>asbestos</strong>-conta<strong>in</strong><strong>in</strong>g material (ACM) to be removedType of ACM Location Condition(Good/Fair/Poor)Asbestos cementroofAsbestos cementpipeAsbestos cementsheetV<strong>in</strong>yl tilesZelemite boardOther (specify)Quantity (m 2 /m 3 )88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!