12.07.2015 Views

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Specific requirements for removalof friable ACMWrap and cut removal work384. This method of removal produces the lowest levels of airborne <strong>asbestos</strong> fibresand is most appropriate for redundant plant and equipment.385. The plant or equipment to be removed needs to be vacuumed with aHEPA-fitted vacuum cleaner and/or wiped with damp rags (which need tobe disposed of as <strong>asbestos</strong> waste). The plant or equipment then needs to bedouble wrapped with 200 micron thick plastic and taped so that the ACM istotally sealed with<strong>in</strong> the plastic. The wrapped plant or equipment can thenbe cut from the rest of the plant and equipment us<strong>in</strong>g mechanical shears oroxy-cutt<strong>in</strong>g tools. Only exposed metal can be cut and care needs to be takento ensure the plastic wrapp<strong>in</strong>g is not punctured or melted. The cut sectioncan then be removed as <strong>asbestos</strong> waste.386. If lagg<strong>in</strong>g has to be removed to allow a pipe to be cut, the glove bag removalmethod may be used to expose the metal at the po<strong>in</strong>t to be cut and fora sufficient length on either side (refer to Figure 10 on page 63). The pipe thenneeds to be cut at the centre of the exposed section.387. A P1 filtered respirator and disposable coveralls need to be worn as a m<strong>in</strong>imumwhile do<strong>in</strong>g wrap and cut removal work. However, if the lagg<strong>in</strong>g is <strong>in</strong> very poorcondition such that significant airborne <strong>asbestos</strong> fibres may be generated,a higher level of respiratory protection may be required or the method ofremoval reconsidered.388. On completion of the removal, employees need to follow the personaldecontam<strong>in</strong>ation procedures described on page 34.64 <strong>Compliance</strong> code / <strong>Remov<strong>in</strong>g</strong> <strong>asbestos</strong> <strong>in</strong> <strong>workplaces</strong> <strong>WorkSafe</strong> <strong>Victoria</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!