12.07.2015 Views

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Additional requirements for licensed<strong>asbestos</strong> removalTable 3: Components of an <strong>asbestos</strong> removal control planInformation to be <strong>in</strong>cluded <strong>in</strong> the<strong>asbestos</strong> removal control planBuild<strong>in</strong>gs andstructuresPlant and equipmentABCNotification requirements have beenmet and required documentation will beon site (eg removal licence, control plan,tra<strong>in</strong><strong>in</strong>g records)Details of the ACM to be removed (eg thelocations, whether the <strong>asbestos</strong> is friable ornon-friable, its type, condition and thequantity to be removed)Consultation with relevant parties (eg HSRs,employees)Friable Non-friable Friable Non-friableP P P PP P P PP P P PD Assigned responsibilities for the removal P P P PEP P P PProgram of commencement and completiondatesF Emergency plans P P P PGP P P PAsbestos removal boundaries, <strong>in</strong>clud<strong>in</strong>g thetype and extent of isolation required and thelocation of any signs and barriersH Control of electrical and light<strong>in</strong>g <strong>in</strong>stallations P P P PIP P P PPersonal protective equipment (PPE) to beused, <strong>in</strong>clud<strong>in</strong>g respiratory protectiveequipment (RPE)J Details of air-monitor<strong>in</strong>g program P P K Waste storage and disposal program P P P PLP P P PMNOMethods for remov<strong>in</strong>g the ACM(wet or dry methods)Asbestos removal equipment (eg sprayequipment, <strong>asbestos</strong> vacuum cleaners,cutt<strong>in</strong>g tools)Details on required enclosures, <strong>in</strong>clud<strong>in</strong>gtheir size, shape, structure, smoke test<strong>in</strong>genclosures and the location of negativepressureexhaust unitsDetails on temporary build<strong>in</strong>gs required bythe <strong>asbestos</strong> removalist (eg decontam<strong>in</strong>ationunits), <strong>in</strong>clud<strong>in</strong>g details on water, light<strong>in</strong>g andpower requirements, negative-pressureexhaust units and the locations ofdecontam<strong>in</strong>ation unitsP P P PP P PMayberequireddepend<strong>in</strong>gon the job.P<strong>WorkSafe</strong> <strong>Victoria</strong> <strong>Compliance</strong> code / <strong>Remov<strong>in</strong>g</strong> <strong>asbestos</strong> <strong>in</strong> <strong>workplaces</strong> 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!