Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria
Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria
Removing asbestos in workplaces - Compliance ... - WorkSafe Victoria
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Additional requirements for licensed<strong>asbestos</strong> removalTable 3: Components of an <strong>asbestos</strong> removal control planInformation to be <strong>in</strong>cluded <strong>in</strong> the<strong>asbestos</strong> removal control planBuild<strong>in</strong>gs andstructuresPlant and equipmentABCNotification requirements have beenmet and required documentation will beon site (eg removal licence, control plan,tra<strong>in</strong><strong>in</strong>g records)Details of the ACM to be removed (eg thelocations, whether the <strong>asbestos</strong> is friable ornon-friable, its type, condition and thequantity to be removed)Consultation with relevant parties (eg HSRs,employees)Friable Non-friable Friable Non-friableP P P PP P P PP P P PD Assigned responsibilities for the removal P P P PEP P P PProgram of commencement and completiondatesF Emergency plans P P P PGP P P PAsbestos removal boundaries, <strong>in</strong>clud<strong>in</strong>g thetype and extent of isolation required and thelocation of any signs and barriersH Control of electrical and light<strong>in</strong>g <strong>in</strong>stallations P P P PIP P P PPersonal protective equipment (PPE) to beused, <strong>in</strong>clud<strong>in</strong>g respiratory protectiveequipment (RPE)J Details of air-monitor<strong>in</strong>g program P P K Waste storage and disposal program P P P PLP P P PMNOMethods for remov<strong>in</strong>g the ACM(wet or dry methods)Asbestos removal equipment (eg sprayequipment, <strong>asbestos</strong> vacuum cleaners,cutt<strong>in</strong>g tools)Details on required enclosures, <strong>in</strong>clud<strong>in</strong>gtheir size, shape, structure, smoke test<strong>in</strong>genclosures and the location of negativepressureexhaust unitsDetails on temporary build<strong>in</strong>gs required bythe <strong>asbestos</strong> removalist (eg decontam<strong>in</strong>ationunits), <strong>in</strong>clud<strong>in</strong>g details on water, light<strong>in</strong>g andpower requirements, negative-pressureexhaust units and the locations ofdecontam<strong>in</strong>ation unitsP P P PP P PMayberequireddepend<strong>in</strong>gon the job.P<strong>WorkSafe</strong> <strong>Victoria</strong> <strong>Compliance</strong> code / <strong>Remov<strong>in</strong>g</strong> <strong>asbestos</strong> <strong>in</strong> <strong>workplaces</strong> 45