13.07.2015 Views

1 RULES THE MADHYA PRADESH BHUMI VIKAS RULES, 1984 ...

1 RULES THE MADHYA PRADESH BHUMI VIKAS RULES, 1984 ...

1 RULES THE MADHYA PRADESH BHUMI VIKAS RULES, 1984 ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

M.P.Bhumi Vikas Niyam, <strong>1984</strong>(7) Projecting Signs - No projecting sign or any part of its supports or frameworkshall project more than 2 meters beyond the main face of the building to whichsuch sign is attaches. At every place where pedestrians may pass underneath aprojecting sign, an over-head clearance of at least 2.5 meters shall be maintained.94. Special requirements of Low-Income Housing Group - Notwithstandinganything contained in these rules, special requirements for low income housing such asE.W.S. and L.I.G. Housing Schemes Developed as clusters by publicAgencies/Government bodies shall be as given in Appendix M.95. Powers of Relaxation - The Director of Town and Country Planning Governmentof Madhya Pradesh may permit special relaxation to any of the rules, provided therelaxation sought does not violate the health safety, fire safety, structural safety, publicsafety of the inhabitants and the building and neighborhood.1 96. Plinth construction check survey - In the case of a high rise building oncompletion of the construction of the plinth the owner of the building shall obtain from theauthority a certificate to the effect that the plinth has been constructed strictly inaccordance with the permissible covered area The owner shall give a notice to theauthority, which shall either issue the certificate or order suitable changes to be made asper the approved site plan. The owner shall carry out such instructions as are given,failing which the authority will be competent to demolish such part of the plinth as in underobjection. The granting of a certificate or the issue of instructions regarding necessarychanges will be done within 15 days of the notice, failing which it will be deemed that thecertificate has issued.2 97. Issue of Service Certificate - On completion of the civil works of the building theowner shall give an application to the authority for issue of a service certificate on thebasis of which service connections, especially water, sewerage and power, shall begranted by the authorities concerned. If the certificate is not issued within 15 days of thenotice, or suitable instructions for changes have not been issued by the authority withinthe period, it would be deemed that the certificate has issued.3 98. Completion Certificate - Every owner of a high rise building on completion of thebuilding and before its occupation of the building and before its occupation shall obtainfrom the authority, a completion certificate to the effect that the building has beencompleted as per the sanctioned plan. Occupancy of a building for which a completioncertificate has not been obtained shall be deemed to be a violation of the permission asper the provision of under Section 36 of the Madhya Predesh Nagar Tatha Gram NiveshAdhiniyam 1973 (No. 23 of 1973) and shall invite the penalty prescribed therein".1 Inserted vide Gazette dt. 12-8-1988.2 Inserted vide Gazette dt. 12-8-1988.3 Inserted vide Gazette dt. 12-8-1988.111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!