13.07.2015 Views

1 RULES THE MADHYA PRADESH BHUMI VIKAS RULES, 1984 ...

1 RULES THE MADHYA PRADESH BHUMI VIKAS RULES, 1984 ...

1 RULES THE MADHYA PRADESH BHUMI VIKAS RULES, 1984 ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

M.P.Bhumi Vikas Niyam, <strong>1984</strong>(c)(d)(e)certificate of Supervision and completion for all buildings;all plans and related information connected with permission fordevelopment of area up to 1 hectare; andCertificate of supervision for development of land area up to 1 hectare.(D) Supervisor-Competence.- The licensed Supervisor shall be entitled to submit:-(E)(a)(b)all plans and related information connected with the permission forresidential buildings up to 200 sqm. and up to two stories or 7.5 metersheight;Certificate of supervision for buildings in (a).Town Planner-Competence. - The licensed Town Planner shall be entitled tosubmit:-(a)(b)all plans and related information connected with permission fordevelopment of all areas;Certificate of supervision for development of land of all areas.(F) Group or Agency. - When an agency or group of qualified architects, engineers,town planners is practicing, then the qualification and competence of work shall be thecombination of the individual qualisfications and competence.27. Grant of permission or refusal.-(1) The Authority may either sanction or refusethe plans and specification or may sanction them with such modifications or directionsas it may deem necessary and thereupon shall communicate its decisions to theperson giving the notice(see Appendix-D).(2) In case of proposal for development work, if in the opinion of the Authority, thelayout of plots. or alignment of the street or access away is not adopted to or woulddetrimentally affect the layout or development of adjoining lands, the authority shallrequire the applicant to alter the layout as deemed necessary. The details of layout ofroads. of quality not less than 150mm. W. B. M. Road, laying of water supply drainagelines to meet the requirement of water supply and sewage affluent of the population tothe level of the municipal main, as decided by the Authority shall be furnished to theentire satisfaction of the Authority or the owner may deposit an amount equal to theexpenses for such development, as estimated by the Authority.28. Limitation period for grant or refusal of permission.- If within periodprescribed in sub-section (5) of Section 30 of the Act, the Authority fails to intimate inwriting to the person, who has given the notice, of its refusal of sanction, the noticewith its plans and statements shall be deemed to have been sanctioned. Subject tothe condition mentioned in this rule, nothing shall be construed to authorize any35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!