- Page 1 and 2: BANGLADESH POWER DEVELOPMENT BOARDT
- Page 3 and 4: 14. Name and address ofthe Office f
- Page 5 and 6: Bangladesh Power Development BoardC
- Page 7 and 8: 32.01 Termination for Convenience -
- Page 9: 27.1 Service Engineers After Warran
- Page 13 and 14: a) Volume 1 Chapter 1: Instruction
- Page 15 and 16: to establish the Tenderer's minimum
- Page 17 and 18: 10.0 INFORMATION TO BE SUPPLIED WIT
- Page 19 and 20: xix)xx)xxi)A list of plant equipmen
- Page 21 and 22: v) The Tenderer may submit cost sav
- Page 23 and 24: Specifications of the equipment/mat
- Page 25 and 26: (vi) Am = First cost in Taka= A + C
- Page 27 and 28: the contract conditions. The Perfor
- Page 29 and 30: (2) Any effort by a Tenderer to inf
- Page 31 and 32: APPENDIX-2FORM OF TENDER(SPECIMEN)S
- Page 33 and 34: Appendix-3Bill of Materials/Quantit
- Page 35 and 36: Sl. No Item Name QtyA1.5COUPLINGFle
- Page 37 and 38: Sl. No Item Name QtyA2.1.2hallPipin
- Page 39 and 40: Sl. No Item Name Qtyengine hallLubr
- Page 41 and 42: Sl. No Item Name QtyExhaust gas boi
- Page 43 and 44: Sl. No Item Name QtyA4.1.8 Suspensi
- Page 45 and 46: Sl. No Item Name Qty- UPS for unit
- Page 47 and 48: Schedule-2Erection & CommissioningS
- Page 49 and 50: Sl No Description QtyUtility block
- Page 51 and 52: Sl No Description QtyEarthworks and
- Page 53 and 54: Sl No Description Qty3F3GSITE WORKS
- Page 55 and 56: Schedule-5Long Term Service Agreeme
- Page 57 and 58: APPENDIX-4TIME SCHEDULEManufacture,
- Page 59 and 60: Our liability under this guarantee
- Page 61 and 62:
eference made a part thereof. This
- Page 63 and 64:
Appendix-7COMPLAINTS AND APPEALSIn
- Page 65 and 66:
1.0 CONTRACT DOCUMENTSCHAPTER II :
- Page 67 and 68:
xiv)xv)xvi)xvii)xviii)xix)xx)xxi)xx
- Page 69 and 70:
commissioning including all other w
- Page 71 and 72:
suitable access for equipment and m
- Page 73 and 74:
The Engineer's decision and the fil
- Page 75 and 76:
shall not be again employed upon th
- Page 77 and 78:
(b)(c)(d)The right of the Board to
- Page 79 and 80:
of the Contractor, afford all avail
- Page 81 and 82:
32.0 RIGHT OF BOARD TO TERMINATE CO
- Page 83 and 84:
Contractor's control to be intimate
- Page 85 and 86:
The Contractor shall comply with su
- Page 87 and 88:
initial commercial operation (ICO)
- Page 89 and 90:
49.0 CLEAN UP OF SITEThe Contractor
- Page 91 and 92:
on account of failure to achieve gu
- Page 93 and 94:
employees or any of the employees o
- Page 95 and 96:
eplacement of any materials lost or
- Page 97 and 98:
portion of such payment. Any sum re
- Page 99 and 100:
2. Engineer 1 Copy3. Director, Dte.
- Page 101 and 102:
Each part of the equipment which is
- Page 103 and 104:
the practical arrangements he is of
- Page 105 and 106:
Chapter IIISpecial Conditions105
- Page 107 and 108:
a. The drawings showing the arrange
- Page 109 and 110:
The Contractor shall erect temporar
- Page 111 and 112:
The Contractor shall be responsible
- Page 113 and 114:
The Contractor shall ensure that no
- Page 115 and 116:
19.0 FIRE PROTECTIONOnly constructi
- Page 117 and 118:
actions of the Board or the employe
- Page 119 and 120:
29.0 OPEPATING AND MAINTENANCE INST