portion of such payment. Any sum retained by the BOARD pursuant to theprovision of this sub Clause shall be paid to the Contractor after the saiddefect is removed.62.0 DOCUMENTATION FOR PAYMENTClaims <strong>for</strong> payment must be supported by the following <strong>document</strong>ation as specifiedhereinafter, Requests <strong>for</strong> reimbursement <strong>for</strong> the cost of equipment materials, freight,transportation and insurance shall be supported by the following <strong>document</strong>s (each copyto be certified by the Contractor or the Contractor's representative to be a true copy ofthe <strong>document</strong> of which it is a copy) :60% of the CIF cost of supply of materials and equipment shall be paid uponpresentation of i) invoice in 3(three) originals, ii) packing list in 3(three) originals,iii) insurance certificate in 1(one) originals, iv) Bill of lading/ Airway Bill in 1(one)original and 3(three) copies marked Freight prepaid, v) Warranty certificate in1(one) original, vi) manufacturer’s factory test certificate in 1(one original, vii)quality and quantity certificate of the materials & equipment shipped in 1(one)original, viii) factory test witnessing certificate in 1(one) original and ix) certificateof origin of equipment & Material as per Contract Agreement issued by themanufacturer of the materials shipped in 1(one) original.Requests <strong>for</strong> mobilisation fund and progress payments shall be supported by thefollowing <strong>document</strong>s:i. One copy or Photocopy of the Contractor's invoice which shall identify theContract and which shall show the total <strong>for</strong>eign currency value of theContract, the total <strong>for</strong>eign currency amounts previously received and/orclaimed as mobilisation fund or progress payments ; the <strong>for</strong>eigncurrency amount being invoiced <strong>for</strong> payment; separate total values as ofthe date of this invoice of equipment and materials delivered (includingshipping and related costs) and services per<strong>for</strong>med; and separate totalvalues since the date of the previous notice.ii.iii.iv.One counterpart of a Work Progress Certificate signed by the Contractorand Jointly countersigned by the Engineer, Consultant and the ProjectDirector.The Contractor shall submit all Work Progress Certificates to both theEngineer and the BOARD simultaneously by registered airmail. TheEngineer, Consultant and the Project Director will either countersign orreject a Work Progress Certificate within a maximum period of thirty(30) days from the date of receipt of such Certificate by him. If theEngineer, Consultant and the Project Director or either shall fail either tocountersign or to reject a Work progress Certificate within the said thirty(30) days period, the Contractor shall notify the BOARD by cable of thedelay in the approval from the Site; and the BOARD will eithercountersign the Work Progress Certificate in question or assign hisreasons <strong>for</strong> not doing so within a maximum period of sixty (60) daysfrom the date of receipt of the Contractor's said cable notice to him.The Contractor shall furnish to the BOARD, Project Director and theEngineer or either whenever called upon to do so any additionalin<strong>for</strong>mation or <strong>document</strong>s that may be required in connection withverification of progress claims and or any other payments made.97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!