13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Any work done without being properly located and established by base lines, offsetstakes bench marks or other basic reference points may be ordered removed andreplaced at the Contractor's cost and expense. The Contractor shall carefullypreserve all monuments, bench marks and reference points.In case of his destruction thereof, the Contractor will be charged with the expensesof replacement and shall be responsible <strong>for</strong> any mistake or loss of time that may becaused. Permanent monuments or bench marks which must be removed ordisturbed shall be protected until they can be properly referenced <strong>for</strong> relocation.The Contractor shall furnish materials and assistance <strong>for</strong> the proper replacement ofsuch monuments or bench marks.21.0 SECURITYThe Contractor shall be solely responsible <strong>for</strong> the security of all equipment andmaterials incorporated or to be incorporated in the Work by him and all equipment,materials, tools, supplies, structures, facilities and others properly used in theprosecution of the Work but not incorporated therein while in his care and custody.The Contractor shall con<strong>for</strong>m also to any specific security requirements of theBoard but such compliance shall not relieve the Contractor from the totalresponsibility <strong>for</strong> security.22.0 HOUSING & TRANSPORTThe Contractor shall arrange by themselves suitable family housing units togetherwith furnishing and utilities in the close proximity of the Site <strong>for</strong> accommodation ofall imported personnel. If the services of any imported personnel of the Contractoror its Subcontractors are required <strong>for</strong> a period of more than six (6) months theContractor may authorise the employees' wife and children accompany him or tosubsequently join him. In any such case the Contractor shall make availablesuitable family accommodations at the proximity of the Site.If the Contractor decides in consultation with the Board that the health or safety ofany imported personnel is or might be Jeopardised by political or health hazards inBangladesh, the Contractor may, after <strong>for</strong>ty eight (48) hours notice, order itsemployees and the employees of its Subcontractors and suppliers to return to theirheadquarters or other safe location, in which case the Work will be deemed to besuspended <strong>for</strong> the duration as may be jointly decided, Provisions of Clause 34.0 ofGC "SUSPENSION OF THE WORK" of Chapter II will apply in case of suspension ofwork.The Contractor shall provide to the extent agreed transport vehicles <strong>for</strong> use duringconstruction period by the expatriate as well as local personnel.23.0 PROTECTION OF WORKThe Contractor shall be solely responsible <strong>for</strong> the protection of his Work until itsFinal Acceptance by the Board. The date of commercial production, or the date ofissuance of the Completion Certificate which ever is earlier shall, except as portionsmay earlier be placed in service, be deemed the date of Final Acceptance.The Contractor shall have no claim against the Board because of any damage orloss to the Contractor's Work, except damage or loss resulting directly from the116

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!