13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a. The drawings showing the arrangement of necessary devicesspecified in the Technical Requirementsb. Sequence and internal connection diagramc. Drawings of installation equipment and measuring instruments to besupplied by the Contractor(5) The Contractor shall, in addition to the <strong>document</strong>s specified in the Contract,furnish without delay the <strong>document</strong>s, drawing and other in<strong>for</strong>mation, whichthough not specified in the Contract, may be required by the Board or theEngineer from time to time during the period of execution of the Contract.(6) Unless otherwise specially provided, any and all expense required to submitthe <strong>document</strong>s, drawing and other in<strong>for</strong>mation in compliance with theContract shall be borne by the Contractor.(7) Prior to fabrication of the equipment, the Contractor shall submit approvaldrawings to the Engineer <strong>for</strong> approval. Should the Engineer directmodifications to be made in order to satisfy the requirements of theSpecifications, the Contractor shall submit modified approval drawings.Alterations in the Contract Price shall not be made by reason of themodifications in the approval drawings. In the event the Contractorproceeds with fabrication without approval of drawings, he shall make thenecessary changes at his own expense. Approval of drawings shall in noway relieve the Contractor of his obligation to satisfy the requirements ofthe Specifications or the responsibility of making corrections in his drawings.All approved drawings shall have a column provided <strong>for</strong> inscription ofmodifications in the contents. Drawings shall clearly indicate modified partsby arrows or other means.(8) After approval, the drawings shall be kept up to date reflecting any changesmade, and upon completion. "As built" drawings (both soft and hard copy)shall be delivered to the Board. The Board's approval shall be obtained <strong>for</strong>all Contractor's drawings including any changes made.1.3 FOUNDATION DESIGNThe Contractor shall be responsible <strong>for</strong> the proper design of the equipmentfoundations to withstand the dynamic load and static load of load of engine andgenerators etc. Location and arrangement of steel rein<strong>for</strong>cement, concretekeyways and detailed drawings showing additional concrete required shall beprepared by the Contractor.2.0 PHOTOGRAPHS DeletedThe Contractor shall furnish to the Board three (3) copies of each photograph takento show shop assembly of equipment and the monthly stages of equipmentinstallation. Each photograph shall show upon its face, the date, the Contractor'sname, and description of the view taken. Photographs shall be taken of eachassembly or sub-assembly to indicate the progress of the Work. Additional107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!