13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

These are provided <strong>for</strong> the convenience of the Tenderer and there is no expressedor implied warranty of their validity.The Tenderers will be deemed to have a satisfactory understanding of theBangladesh Laws, Rules & Regulations on goods and materials as applying to allshipments under this Contract.22.0 QUALITY ASSURANCEThe Proposal shall include copies of the Tenderer's "Quality Certification Manual'and a comprehensive statement of the "Scope of Quality Verification" exercised inexecuting existing contracts.Sufficient in<strong>for</strong>mation shall be provided in the Proposal to give assurance that therequirements of quality as described in the Special Conditions are fully understood.23.0 USE OF BANGLADESH MATERIALSThe Tenderers are required to use, wherever possible, equipment, tools, materialsand products manufactured in Bangladesh when available, provided that such itemsshall con<strong>for</strong>m to the applicable specifications.24.0 SPARE PARTSSpares during Warrantee periodThe Contractor shall submit a list of Essential spare parts with OEM Part No. andconsumables to be necessary <strong>for</strong> maintenance of the unit(s) and other plantequipment inclusive of emergency use that takes place in the course of operation(according to the Manufacture's recommendation and guideline) during theWarranty period (24 months). During the warranty period of 24 months, theContractor shall supply all necessary equipment, spare parts,materials/consumables etc. at his own cost and whether it is listed or not in theirlist.Spares during Long Term Service agreement (LTSA)The Tenderer shall, in addition to essential spare parts and consumables <strong>for</strong>warrantee period also submit a list of spare parts with OEM pat no. <strong>for</strong> LTSA period(next 4 years after warrantee period) which reflects the OEM's guidelines andTenderer's experience in the operation and maintenance of the type of equipmentproposed. For LTSA period also the Contractor shall supply all necessaryequipment, spare parts, materials/consumables etc. at his own cost and whether itis listed or not in their list.25.0 EVALUATIONThe Technical & Financial Proposals submitted by the Tenderers shall be openedfirst in presence of the Tenderers, if any. The technical qualifications and overallcapability of the Tenderer <strong>for</strong> carrying out the Works as specified as well as the22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!