13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

on account of failure to achieve guaranteed net <strong>power</strong> output, heat rate,trans<strong>for</strong>mer loss and failure to complete the specified supply and/ or work withinthe period of time stipulated in the Contract.In the case of individual trips/ unscheduled shutdown of the units of the plant, thepenalty shall be proportional to the reduction of <strong>power</strong> from the offered net output.Load restriction (partial load operation due to contractor's or machine fault) willalso be considered as unscheduled shutdown and these period will be calculatedand penalised proportional to the reduction of energy (MWhr) from the offered netenergy (MWhr) <strong>for</strong> these period.51.0 CLAIMS FOR LABOUR AND MATERIALSThe Contractor shall indemnify and save harmless the Board from all claims <strong>for</strong>labour and materials furnished under this Contract.52.0 MAINTAINING COMMERCIAL OPERATIONThe Contractor shall prosecute the Work in such a manner that the minimumdisturbance to maintaining commercial operation of the existing <strong>power</strong> system andappurtenances will result. Any outage of <strong>power</strong> shall be requested in writing to theBoard at least five (5) days in advance and shall be scheduled during weekends,nights, or other periods of low demand. Any operations that may endanger theintegrity of the <strong>power</strong> system shall first be cleared with the Board.53.0 CUTTING INTO EXISTING WORKCutting into existing work that will affect commercial operation or integrity of the<strong>power</strong> system shall be conducted in accordance with Clause 52.0, "MAINTAININGCOMMERCIAL OPERATION". Cutting into transmission / Auxiliary system andcommunication system, or other work not involving the above shall be per<strong>for</strong>med insuch a manner that the per<strong>for</strong>mance of the existing system will not be adverselyaffected, except <strong>for</strong> temporary personnel inconvenience. After putting inthe new work, the existing work shall be returned to satisfactory and safe condition,equivalent or better, than it was found.54.0 MAJOR ECONOMIC DISLOCATION : Deleted55.0 PAYMENT OF DUTIES, TAXES, VAT, FEES AND OTHER TAXES:55.01 a) For Contractor’s equipment, materials and servicesThe Contractor shall be entirely responsible <strong>for</strong> all Bangladesh Custom and Importduties, VAT, taxes and all other levies imposed under applicable law of Bangladesh<strong>for</strong> Importation of Contractor’s Construction equipment, tools and materialsrequired <strong>for</strong> implementation of the contract in Bangladesh which shall be importedon the condition to be exported after completion of the work, if the same are notexempted from such taxes, VAT & levies. The Board shall assist to the contractor toobtain exemption from NBR [National Board of Revenue] or CCIE [Chief Controller91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!