13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

een accepted and that the Board desires to enter into a mutually acceptablecontract.xxvii) Whenever in these Contract Documents the words "as ordered", “ It asdirected", "as required", "as permitted" "as allowed" or words or phrases oflike import are used,, it shall be understood that the order, direction,requirement, permission, or allowance of the Board or the Engineer isintended only to the extent of judging compliance with the terms of theContract; none of these terms shall imply that the Board or the Engineer hasany authority over or responsibility <strong>for</strong> supervision of the Contractor's <strong>for</strong>cesor construction operation, such supervision including sole responsibilitythere<strong>for</strong>e being strictly reserved <strong>for</strong> the Contractor.xxviii) Similarly the words "approved", “reasonable", "suitable", "acceptable",'properly", "satisfactory", or words of like effect and import, unless otherwiseparticularly specified herein shall mean approved, reasonable, suitable,acceptable, proper, or satisfactory in the judgment of the Board or theEngineer, to the extent provided in subsection xxvii) above.xxix)xxx)xxxi)Whenever any statement is made in the Contract Documents containing theexpression "it is understood and agreed", or an expression of like import,such expression means the mutual understanding and agreement of theparties executing the Contract Documents of which these General Conditionsare apart."FUND" shall mean the <strong>for</strong>eign currency and local currency to be provided bythe Government of the People's Republic of Bangladesh.“Commissioning” shall mean completion of necessary tests of the Power Plantby the Contractor to ensure the reliable commercial operation of the same asper Contract .xxxii) “Project Acceptance Committee” shall mean the representatives of the Boardwho are responsible <strong>for</strong> witnessing in collaboration with the representativesof the Engineer, the inspection and test of the Work prior to issue of the“Completion Certificate”. The Project Acceptance Committee will beconstitute by the Board.xxxiii) “Initial Commercial Operation” (ICO) shall relate to the operation of theplant. “ICO” shall mean the successful continuous operation <strong>for</strong> seven (7)days (168 hours) of the plant including its auxiliaries on automatic andsupervisory controls.xxxiv) “ Taking Over Certificate by the Board” [or PAC] shall mean the Taking Overof the plant completed in all respects after successful completion of ICO andcarrying out of the per<strong>for</strong>mance test.xxxv) “ Contract Amount” shall mean the same as “ Contract Price”xxxvi) “ Contractor’s Equipment” shall mean the equipment machinery, tool, spares,consumable and goods of kinds (as distinct from “Plant” or “PermanentWork”) to be used only <strong>for</strong> the construction works at the contractor’sexpense and remain the property of the Contractor. The Contractor’sEquipment will not <strong>for</strong>m a part of the “ Permanent Works”.xxxvii) “ Turnkey Work” shall mean design, engineering, manufacturing, inspection,testing, supply, delivery to the site, construction, erection, testing and68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!