13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

29.0 OPEPATING AND MAINTENANCE INSTRUCTIONSTwelve (12) copies of complete operating and maintenance instructions in English,(including inventories of spare parts and tools and parts lists with orderinginstructions), bound in book <strong>for</strong>m, shall be furnished by the Contractor <strong>for</strong> eachpiece of equipment. Operating instructions explaining preventive maintenanceprocedures, methods of checking the system <strong>for</strong> normal safe operation, andprocedure <strong>for</strong> safely starting and stopping the system shall be prepared in typed<strong>for</strong>m, complete with wiring, flow, and control diagram.Soon after start up of the plant, qualified personnel shall be provided by theContractor to instruct selected representatives of the Board in the operation andmaintenance of the equipment. At least three(3) weeks notice to carry out suchinstructions shall be given to the Engineer and the Board by the Contractor,together with an agenda and procedure, <strong>for</strong> approval of the Engineer.30.0 GUARANTEE ON PERFORMANCEThe Contractor must guarantee the per<strong>for</strong>mance of each plant and equipment asspecified in GUARANTEE SCHEDULE-A, Vol. 3 of 3.30.1 Net outputIf the plant fails to achieve such net <strong>power</strong> output at site conditions asguaranteed by the Contractor in GUARANTEE SCHEDULE-A, he shall pay to the BOARD aliquidated damage in US Dollar:30.2 Heat rateAn amount at the rate of one(1) percent of the Contract Price <strong>for</strong> each one(1)percent or a part thereof decrease in net output.If the net heat rate <strong>for</strong> the plant exceeds the guaranteed value [GUARANTEESCHEDULE-A] by the Contractor by more than One (1) percent, he shall pay to the BOARDa liquidated damage an amount at the rate of one(1) percent of the Contract Price <strong>for</strong> eachone(1) percent or a part thereof increase in the heat rate above the tolerance of one(1)percent on the guaranteed value. The increase in heat rate is to be calculated by thefollowing <strong>for</strong>mula: -Hg : Guaranteed heat rateHg(100) : Guaranteed heat rate at 100% base ratingHg(75) : Guaranteed heat rate at 75% base ratingHg(50) : Guaranteed heat rate at 50% base ratingHg(W) : Calculated weighted average guaranteed heat rate,Hg(W) = Hg 100% x 0.8 + Hg 75% x 0.1 + Hg 50% x 0.1Ha(100) : Actual measured heat rate at 100% base loadHa(75) : Actual measured heat rate at 75% base loadHa(50) : Actual measured heat rate at 50% base loadHa(W) : Calculated weighted average actual heat rate,119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!