13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Each part of the equipment which is to be shipped as a separate piece or smallerparts packed within the same case shall be legibly marked to show the unit ofwhich it is a part and matchmarked to show its relative position in the unit, tofacilitate assembly in the field. Unit marks and matchmarks shall be made withsteel stamps and with paint.Each case shall contain a packing list showing the detailed contents of the package.When any technical <strong>document</strong>s are Supplied together with the shipment ofmaterials no single package shall contain more than one set of such <strong>document</strong>s.Shipping papers shall clearly indicate in which packages the technical <strong>document</strong>sare contained.The case number shall be written in the <strong>for</strong>m of a fraction, the numerator of whichis the serial number of the case and the denominator the total number of case inwhich a complete unit of equipment is packed.Wherever necessary besides usual inscriptions the cases shall bear specialindication such as "Top", "Do not turn over", "Care', "Keep dry", etc., as well asindication of the centre of gravity (with red vertical lines) and places <strong>for</strong> attachingslings (with chain marks).Cases which cannot be marked as above shall have metal tags with the necessarymarkings on them. The metal tags shall be securely attached to the packages withstrong steel binding wire.Each piece, skid, case or package shipped separately shall be labelled or taggedproperly.66.0 COMPLETIONAll works under the scope of this Contract shall be completed on or be<strong>for</strong>e theexpiration of Four hundred fifty (450) calendar days counted from the Contracteffective date.67.0 PROVISIONAL ACCEPTANCE CERTIFICATE (PAC)The work shall not be considered as complete until a PAC has been issued <strong>for</strong>the work, signed and dated by the Acceptance Committee constituted by theBOARD and the Engineer and delivered to the Contractor with a copy to theBOARD. The PAC will be issued (by the Board) only after a final inspection andper<strong>for</strong>mance test of the <strong>power</strong> plant has been carried out by a team ofrepresentatives of the Contractor, the Engineer and the members of theacceptance committee of the BOARD, and the work has been judged completeand in compliance with the Contract Documents. The test shall be per<strong>for</strong>med asspecified in the applicable Technical Requirements. Necessary testing equipmentwill be supplied by the Contractor. The final inspection and the per<strong>for</strong>mance testof the unit and the subsequent issuance of the PAC shall not be construed as arelease to the Contractor from any contractual liability or responsibility, suchrelease being subject only to the provisions of the release of liability clause,Clause GC-68. The BOARD may take over completed portions of the work, priorto completion of the Contract, by written notice to the Contractor.101

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!