conducted in a manner to the satisfaction of the Engineer. Should the rate ofprogress of the Work or any part thereof be at any time in the opinion of theEngineer too slow to ensure the completion of the Work by the prescribed time <strong>for</strong>completion, the Engineer will so notify the Contractor in writing and the Contractorshall thereupon take such steps, as the Contractor may think necessary and theEngineer may think necessary and the Engineer may approve, to expedite progressso as to complete the Works by the prescribed time or extended time <strong>for</strong>completion. The Contractor shall not be entitled to any additional payment <strong>for</strong>taking such steps.39.0 URGENT REPAIRSIf by reason of any accident or failure or other event occurring to in or inconnection with the Work or any part thereof either during the execution of theWork or during the warranty period any remedial or other work or repair shall inthe opinion of the Engineer be urgently necessary <strong>for</strong> security and the Contractor isunable or unwilling at once to do such work or repair the Board may by his own orother workmen do such work, or repair so done by the Board is work which theContractor was liable to do at his own expense under the Contract all costs andcharges properly incurred by the Board in so doing shall on demand be paid by theContractor to the Board or may be deducted by the Board from any monies due orwhich may become due to the Contractor. Provided always that the Engineer will assoon after the occurrence of any such emergency as may be reasonably practicablenotify the Contractor thereof in writing.40.0 CONTRACTOR TO CHECK PLANS AND SCHEDULESDuring the course of the Work, the Contractor shall check all dimensions elevations,and quantities shown on the plans and schedules related to the Work given to himby the Engineer, and shall notify the Engineer of any discrepancy found betweenthe plans and the conditions on the ground, or any error or omission in plans or inthe layout as given by staked points, or instruction, which he may discover. TheContractor will not take advantage of any minor error or omission in the plans orthe Contract Documents. Full instructions will be furnished by the Engineer shouldsuch error or omission be discovered, and the Contractor shall carry out suchinstructions as if originally specified.No work shown on the plans, the dimensions of which are not indicated, shall beexecuted until necessary dimensions have been obtained from the Engineer.41.0 LAWS AND REGULATIONSThe Contractor shall observe and comply with all applicable ordinances, laws andregulations in the Country or Countries where the Contractor may reside or per<strong>for</strong>mwork, directly or indirectly under this Contract. The Contractor shall protect andindemnify the Board and the Board's officers and agents against any claim orliability arising from or based on violation of ordinances, regulations, or laws of theCountry where the Contractor may reside or per<strong>for</strong>m any of the Work.The Contractor shall observe, comply with and respect Bangladesh laws, rules andregulations and shall not interfere with Bangladesh Political or religious affairseither directly or indirectly.84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!