In addition, the Contractor shall submit to the Board a schedule of all personnelwhich he intends to import into Bangladesh <strong>for</strong> the Work covered by this Contract.This Schedule shall include any non-Bangladesh personnel presently employed inBangladesh who will be assigned to the Work. The schedule shall include the nameand present address of each person, his intended assignment and responsibility inconnection with the Work and a concise resume of his experience in the type ofwork to which he will be assigned.6.0 CUSTOMS CLEARANCEThe Contractor shall be responsible <strong>for</strong> Bangladesh customs clearance of allmaterials, supplies, equipment, tools and other articles shipped into Bangladesh bythe Contractor <strong>for</strong> the accomplishment of this Work, including the food and thepersonal effect of the Contractor's personnel. This customs clearance will take placeat the Bangladesh port (Chittagong/Mongla), or at the International Airport atDhaka. The Board will, however, pay import and export duties (custom duties, saletax, etc.), excise duty, import permit fees and all other taxes leviable in Bangladeshon only the equipment and materials that will be incorporated in the PermanentWorks (as distinct from the Contractor's equipment, tools, spares, consumables,etc.). The Board will help the Contractor to obtain necessary import permits andlicenses required <strong>for</strong> customs clearance.All payment <strong>for</strong> clearance charge, storage charge, etc. (excluding charge, fees, etc.claimed by Clearing Agents, if any) which are imposed by the relevant agencies ofthe Government of Bangladesh, relating to the clearance of equipment andmaterials that will be incorporated in the Permanent Works shall be made by theBoard subject to the Condition that if the Contractor makes delay in submittingnecessary shipping <strong>document</strong>s to the Board, the demurrage charges by the PortAuthority will be borne by the Contractor ( chapter II, clause 55.0 )Tools and equipment <strong>for</strong> use during construction but which are to remain theproperty of the Contractor and which are to be exported by the Contractor fromBangladesh at the completion of the Work shall be carefully <strong>document</strong>ed andspecially listed to facilitate both import and export. The Contractor shall determineprior to shipment the customs regulations applicable to this special case as well asnormal import rules and regulations applicable.The Contractor shall also be responsible <strong>for</strong> inland transport by barge/ truck/trainto the Site.7.0 RECEIVING, TRANSPORTING, HANDLING AND STORAGEThe Contractor shall receive, transport, handle, store and install all materials andequipment furnished under these specifications, or otherwise involved in theper<strong>for</strong>mance of this Contract. It shall be the responsibility of the Contractor todetermine the availability and capacity of transportation and unloading facilities andto make whatever arrangements are required to secure to the necessary facilities.The Board will not be responsible <strong>for</strong> furnishing any equipment or providing anyservices.110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!