13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

shall not be again employed upon the Work without the written permission of theBoard through the Engineer. Any person so removed from the Work shall bereplaced immediately by a competent substitute approved by the Board.20.0 SETTING OUTThe Contractor shall be responsible <strong>for</strong> the true and proper setting out of the Workin relation to original points, lines and levels of reference given by the Engineer inwriting and <strong>for</strong> the correctness, subject as above mentioned, of the position, levels,dimensions and alignment of all parts of the Work and <strong>for</strong> the provision of allnecessary instruments, appliances and labour in connection therewith.If at any time during the progress of the Work any error shall arise in the position,levels, dimensions or alignment of any part of the Work, the Contractor, on beingrequired to do so by the Engineer, shall at his own expense rectify such error to thesatisfaction of the Engineer. The checking of any setting out or of any line or levelwill be verified by the Engineer but shall not in any way relieve the Contractor of hisresponsibility <strong>for</strong> the correctness thereof and the Contractor shall carefully protectand preserve all bench marks, sight rails, pegs and other things used in setting outthe Work. The Contractor shall from time to time recheck the setting out of theWork and notify the Engineer accordingly.21.0 FENCING, LIGHTING AND GUARDINGThe Contractor Shall be responsible <strong>for</strong> the proper fencing, lighting, guarding andwatching of all the Work on the Site until Taking-over and <strong>for</strong> the proper provisionduring a like period of temporary roadways, foot-ways, guards, and fences as far asthe same may be deemed necessary by reason of the Work <strong>for</strong> the accommodationand protection of the Board and occupiers of adjacent property, the public andothers.22.0 CARE OF WORKFrom the Commencement to the completion of the Work the Contractor shall takefull responsibility <strong>for</strong> the care thereof and of all Temporary Work and Contractor'sEquipment and in case any damage, loss or injury shall happen to the Works or toany part thereof or to any Temporary Work or Contractor's Equipment from anycause whatsoever shall at his own cost, repair and make good the same so that atcompletion, the Work shall be in good order and condition and in con<strong>for</strong>mity inevery respect with the requirements of the Contract and the Engineer's instructions.The Contractor shall also be liable <strong>for</strong> any damage to the Work occasioned by himin the course of any operations carried out by him <strong>for</strong> the purpose of the complyingwith his obligations under this Contract.23.0 FORCE MAJEUREThe term "Force Majeure" means any cause beyond the control of the Board or theContractor which the Board or the Contractor could not <strong>for</strong>esee and or reasonablyprovide against at the time the Contract was made and which prevents the Boardor the Contractor from wholly or partly per<strong>for</strong>ming any duties under the Contract.Force Majeure includes, but is not limited to, any of the following :75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!