26.0 ACCEPTANCE TESTINGThe issuance of the Completion Certificate [PAC] as specified in Chapter II"GENERAL CONDITIONS", Clause 67 "PAC", shall be contingent upon the successfuland favourable completion of all inspections and testing required to verify theper<strong>for</strong>mance, installation, and acceptability of the Work. The Contractor'sRepresentative and key technical, supervisory and skilled personnel, with necessarytools and equipment, shall remain at the Site until the Completions Certificate isissued, and shall make all adjustments and modifications required to comply withthe per<strong>for</strong>mance and acceptance requirements. Acceptance Tests shall beconducted at the Site by the Contractor to prove the per<strong>for</strong>mance of each plantaccording to the guarantees as specified in the Tender Form under the attendanceof the Board/Engineer.The Contractor shall furnish the characteristics data of the plants according to theper<strong>for</strong>mance given in the Tender Form, to be supplemented by the Contractor asnecessary.Be<strong>for</strong>e commencement of Acceptance Tests, the Contractor shall ensure that eachgenerating unit shall have operated successfully without any interruption <strong>for</strong> seven(7) days (168 hrs.)27.0 SUPERVISION DURING WARRANTY PERIODThe Contractor shall provide three competent engineers during warranty period <strong>for</strong>smooth maintenance and operation.The engineers shall stay in Gopalganj town or at Site from the date of beginning ofthe warranty period until the date of completion of the warranty period. Expenses<strong>for</strong> the above shall be borne by the Contractor.27.1 SERVICE ENGINEERS AFTER WARRANTY PERIOD (TO BE PART OF 'LTSA')The Board may need the services of qualified Service Engineers, after expiry ofwarranty period, <strong>for</strong> carrying out the following work.i) undertaking major repair of all main equipment in the projectii)iii)overhauling of the plant.trouble shooting job of complex natureAccordingly a separate LTSA <strong>document</strong> with terms and condition is attached alongwith this <strong>document</strong>.The Contractor will be obliged to submit offer to provide the services along with therequired spares <strong>for</strong> a period of four (4) years after the expiry of the warranty period. Theoffer shall include all the repair & maintenance service required <strong>for</strong> the smooth operationof the plant <strong>for</strong> the stipulated period.28.0 DISPOSAL OF REPLACED EQUIPMENT AND MATERIALEquipment and materials replaced by the Contractor will be inspected by theEngineer or the Board. If found in usable, or repairable condition, the Contractorshall place them in storage at the point designated. All other equipment andmaterial will be classed as debris, and disposed off.118

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!