The Contractor shall be responsible <strong>for</strong> the prompt unloading of all equipment ormaterials. The Contractor shall pay any demurrage incurred due to delay inunloading and <strong>for</strong> any other reasons except the case that the Board has notarranged timely discharge of the payment of custom duties.Storage space will be allocated on the Plant Site by the Board be<strong>for</strong>e unloading anymaterials or equipment, the Contractor shall prepare and submit to the ProjectDirector a drawing showing the proposed utilisation of the storage space allocatedto him. The storage space shall be utilised in accordance with the drawing asapproved by the Board. This drawing shall be kept current and shall show thelocation and description of each stored item <strong>for</strong> which Contractor is responsible.Revised copies of these drawings shall be submitted to the Project Director as theyare made. The Contractor shall examine the Site and the means of transportationfrom the storage space.The Contractor shall handle materials and equipment carefully to prevent damageor loss. The use of bare rope slings <strong>for</strong> handling will not be permitted unlessspecifically approved by the Engineer. Special handling devices shall be used whennecessary to avoid damage.7.1 PLATFORMSOpen plat<strong>for</strong>ms shall be constructed by the Contractor at least 50 cm above gradeand shall have adequate flooring and base structure to support the stored materialsand equipment.7.2 INDOOR STORAGEIndoor storage shall be constructed by the Contractor by suitable means <strong>for</strong>keeping materials and equipment from contact with the ground.7.3 SHORINGShoring shall be provided by the Contractor to safely support materials andequipment not less than 30 cm above the ground.7.4 WEATHERPROOF COVERINGSWeatherproof coverings <strong>for</strong> outdoor storage shall be provided by the Contractorand shall utilise a waterproof flame resistant type of sheeting. The sheeting shallbe carefully placed and tied down to prevent moisture from entering the laps andto prevent wind damage to the coverings.8.0 EQUIPMENT PERFORMANCEThe Contractor shall be responsible <strong>for</strong> the correct design and operation of eachindividual item of equipment in his supply. In addition, he shall be responsible <strong>for</strong>the correct per<strong>for</strong>mance and operation of his equipment when functioning withequipment supplied by other contractors. The Contractor shall carry out suchdesign work and tests on systems within his supply as may be necessary <strong>for</strong>establishing and demonstrating their combined per<strong>for</strong>mance and good working tothe satisfaction of the Engineer.111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!