13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl. No Item Name Qty- UPS <strong>for</strong> unit control system in addition to Control& Communication system.A8 MAINTENENCE FACILITY 1 (one) lotA8.1 OVER-HEAD CRANES 1 (one) lotA8.2 LIFTING EQUIPMENTA8.2.1 Fork lift (5 ton) 2 no.A8.2.2Mobile crane (25 ton capacity)1 no.A8.2.3 Truck/ lorry (5 ton) 2 no.A8.2.4 Half track (1ton) 2 no.A9 OFF BASE FIRE FIGHTING FACILITYA9.1 Foam Based Fire-fighting facilities 1 (one) lotA9.2 Hydrant system including water main, hydrant 1 (one) lotstands, hoses, motor driven and engine driven firefighting pumps, jockey pump etc.A9.3 Portable fire fighting equipment. 1 (one) lotA9.4 Other fire fighting related equipmentA10 SPARE PARTS AND CONSUMABLES FOR 2 YEARSWARRANTEE PERIODA10.1 CONSUMABLES FOR WARRANTEE PERIOD1 (one) lotOPERATIONA10.2 SPARE PARTS FOR WARRENTEE PERIOD1 (one) lotOPERATIONA11 SPECIAL MAINTENANCE TOOLS includingEngine maintenance tools (set) 1 (one) lotEngine hand tools (set) 1 (one) lotForeign CurrencyBangladesh TakaFOB Price Freight Insurance Insurance <strong>for</strong>Transportationup to SiteCustom Clearanceand InlandTransportationRate Total Rate Total Rate Total Rate Total Rate Total45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!