49.0 CLEAN UP OF SITEThe Contractor shall clean the working areas periodically of all trash and wastematerials and shall maintain the Site in a neat and orderly condition throughout theconstruction period. The Engineer shall have the right to determine what is wastematerial or rubbish and the manner and place of disposal. On or be<strong>for</strong>e thecompletion of the Work the Contractor shall, without charge there<strong>for</strong>e, carefullyclean out all pits, pipes, chambers or conduits, and shall tear down and remove alltemporary structures built by him, and shall remove all rubbish of every kind fromthe tracts or grounds which he has occupied and shall leave them in first classcondition.In the event that the Contractor fail to comply with the cleanliness requirement orto per<strong>for</strong>m the clean up work assigned to him by the Board the Board will reservethe right to hire another contractor to per<strong>for</strong>m the necessary cleaning work and theContractor shall reimburse the Board f or the cost of all such clean up work.50.0 WARRANTYThe Contractor warrants that each item of materials, equipment and the workfurnished under this Contract will be as specified and will be free from all defects indesign, workmanship, materials & equipment etc. The warranties contained inthese Contract Documents are the warranties made by Contractor with respect tothe design, material, equipment and the work. If within the warranty period set<strong>for</strong>th below, any part of the material, equipment, any defects in design or the Workfails to meet the warranty, the BOARD will notify the Contractor and theContractor shall promptly correct any defects, including non-con<strong>for</strong>mance with thespecifications, by adjustment, repair or replacement of any and all defective partsor materials.Unless otherwise specified, the warranty period hereunder shall begin on the dateof Taking-over by the BOARD or date of Completion Certificate issuance (whicheveroccurs first) and shall end after twenty-four (24) months. During the warrantyperiod, if any equipment/material is damaged and replaced by the Contractor, freshwarranty period <strong>for</strong> twenty four (24) months shall be counted <strong>for</strong> the replacedequipment/material.During the warranty period of 24 months, duration of unscheduled outages due toContractor’s fault shall be worked out, which shall be added to 24 months warrantyperiod i.e. warranty period shall be extended accordingly by such unscheduledoutages.During the warranty period of 24 months, the Contractor shall supply all necessaryequipment/ equipment parts, materials/consumables at his own cost.The Contractor shall pay all costs <strong>for</strong> correction of defects, including shop and fieldlabour and supervision transportation parts, supplies and special tools.The Contractor will be given an opportunity to confirm the existence of the defectbut he shall not delay the correction while making such determination. This sectionstates the limit of the Contractor's liability <strong>for</strong> defects <strong>for</strong> which it is responsible.When it is necessary to dismantle Piping, ducts, machinery, equipment or otherwork furnished or per<strong>for</strong>med by the Contractor in order to obtain access to theWork, the cost of all such dismantling and re-assembly will be paid by theContractor.89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!