13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

xix)xx)xxi)A list of plant equipment, material etc. which the contractor intend to reexportor sale in Bangladesh after the completion of the contract.A list of special tools and equipment <strong>for</strong> maintenance and overhauling of themachine/equipment to be handed over to Board.Authorization Certificates from the manufacturers of main equipment andtype test report (where applicable) viz Engine Generating Set, Step upTrans<strong>for</strong>mers, HV Circuit Breakers etc. that they will supply theirmachine/equipment to <strong>BPDB</strong> through the <strong>tender</strong>er <strong>for</strong> this project, in theevent the <strong>tender</strong>er concerned is not the manufacturer of the same.13.0 TENDER CURRENCIESThe prices shall be quoted in the following currencies :a) The prices <strong>for</strong> the Goods and Services which the Tenderer will supply fromoutside Bangladesh shall be quoted in U.S. Dollars or Euro, which isconvertible to Bangladesh Taka.b) The prices <strong>for</strong> the Goods and Services which the Tenderer will supply fromwithin Bangladesh shall be quoted in Bangladesh Taka.14.0 FINANCIAL PROPOSALThe Tenderer shall fill in the Price Schedule and shall quote a firm turnkeycontract price including LTSA <strong>for</strong> the Power Plant as described in the TechnicalRequirements including all required spare parts and consumables during Warrantyperiod. No additional cost will be considered <strong>for</strong> any items/works of the Tender<strong>document</strong>s which the Tenderer/Contractor has overlooked but the essential <strong>for</strong> thefull completion of the project in every respects. Prices quoted shall be firm <strong>for</strong> aperiod of 180 Calendar days from the closing date <strong>for</strong> receipt of Proposals and bevalid <strong>for</strong> the entire period of the Contract execution. The total prices shall bequoted both in figures and words.No escalation or addition of price whatsoever in the firm proposal pricetill the successful completion of the Power Plant is allowed.Price Proposals determined to be substantially responsive will be checked byTEC/Board <strong>for</strong> any arithmetic errors. Arithmetic errors will be rectified on thefollowing basis. If there is a discrepancy between the unit rate and the total costthat is obtained by multiplying the unit rate and quantity, the unit rate shall prevailand the total cost will be corrected. If there is a discrepancy between the totalTender amount and the sum of total costs, the sum of the total costs shall prevailand the total Tender amount will be corrected. If there is a discrepancy betweenword and figure, the amount quoted in word will prevail. If the Tenderer doesnot accept correction of arithmetic errors, his <strong>tender</strong> shall be rejected.The Tenderer shall quote a price against each item in the Price Schedule(Annexure-3). Unit prices furnished by the Tenderers in the Price Schedule will beused in determining the value of Variation Orders, if any.19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!