13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

commissioning including all other works to complete the project on a TurnkeyWork basis.xxxviii) TEC mean Tender Evaluation Committee.3.0 ASSIGNMENTThe Contractor shall not assign the Contract or any part thereof or any benefit orinterest therein or thereunder without the prior written consent of the Board.4.0 SUB-LETTINGThe Contractor shall not sub-let the whole of the Works. Except where otherwiseprovided by the Contract, the Contractor shall not sub-let any part of the Workswithout the prior written consent of the Board and such consent if given shall notrelieve the Contractor from any liability or obligation under the Contract and heshall be responsible <strong>for</strong> the acts, defaults and neglects of any Subcontractor, hisagents, servants or workmen as fully as if they were the acts, defaults or neglectsof the Contractor, his agents, servants or workmen.Should any Subcontractor fail to per<strong>for</strong>m in a satisfactory manner the worksundertaken by him, the Contractor upon notice from the Board/the Engineer shallimmediately terminate his Subcontract. Nothing contained in this Contract shallcreate any contractual relationship between any Subcontractor and the Board.That means that the Board shall not deal with the affairs of Subcontractors. For allWorks, the Contractor shall be held responsible to the Board.5.0 ORAL STATEMENTS NOT BINDINGIt is understood and agreed that the written terms and provisions of this Contractshall supersede all oral statements, and oral Statements shall not be effective or beconstrued as being a part of or altering this Contract in any way.6.0 STANDARD SPECIFICATIONSReference to standard specifications of any technical society, organisation, orassociation, or to codes of local or national authorities, shall mean the lateststandard, code, specification, or tentative specification adopted and published at theDate of Contract unless specifically stated otherwise.7.0 EXTENT OF CONTRACT:The Contract comprises the design of 100±15% MW Power Plant (HFO fired EngineGenerating Sets) and their execution, design, manufacture, factory testing,transportation and delivery to the Site, erection, testing and commissioning andwarranty of the Work, and the provision of all labour, materials, temporary worksand Contractor's equipment, required in and <strong>for</strong> such design, manufacture, testing,transportation and delivery to the Site, erection, completion, testing andcommissioning, trial run and warranty of the Work, providing training to the Board'spersonnel at the Site so far as the necessity <strong>for</strong> providing the same as is specifiedin the Contract.69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!