13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Contractor shall at all times take reasonable precautions to prevent anyunlawful, riotous or disorderly conduct by, or amongst his employees, and <strong>for</strong> thepreservation of peace and protection of persons and property in the neighbourhoodof the Work against the same.Whenever the Engineer's Representative shall notify the Contractor in writing thatany man on the Work is, in his opinion, incompetent, unfaithful, or disorderly, orwho uses threatening or abusive language to any person representing the Boardwhen on the Work, such man shall be immediately discharged from the Work andshall not be re-employed thereon except with the consent of the Engineer. TheContractor shall replace such employees so discharged as is practical if replacementis required.All imported personnel of the Contractor under this Contract shall remainemployees of the Contractor and shall receive their salaries and allowances directly<strong>for</strong>m the Contractor. The Contractor agrees not to discriminate against anyemployee or applicant <strong>for</strong> employment by reason of race, colour or national originin carrying out this Contract.The Contractor shall be responsible <strong>for</strong> observance of his Subcontractors of the<strong>for</strong>egoing provisions.43.0 WORKING HOURSNo work shall be done on legal Bangladesh holidays or at times other than theregularly established working hours without the written approval of the Engineer.However, work necessary in case of emergencies or <strong>for</strong> the proper case, receipt,unloading, transporting, maintenance, and protection of equipment or finished workmay be done without prior approval.This requirement shall not preclude the Contractor's use of scheduled overtimework and such work may be established by the Contractor, as a regular procedure,with the written permission of the Engineer; such permission, however, may berevoked at any time by the, Engineer if the Contractor fails to maintain adequateequipment and supervision <strong>for</strong> proper prosecution and control of the Work and alloperations per<strong>for</strong>med thereunder.44.0 UNFAVOURABLE CONSTRUCTION CONDITIONSDuring unfavourable weather, the Contractor shall confine his operations toportions of the Work which will not be affected adversely thereby. No portion ofthe Work shall be constructed under conditions which would affect adversely thequality or efficiency thereof, unless special means or precautions are taken by theContractor to per<strong>for</strong>m that portion of the Work in a proper and satisfactory manner.45.0 LIQUIDATED DAMAGES AND REWARDIt is understood and agreed that time is the essence of the Contract. Should theContractor fail to complete the specified supply and portions of the Work within theperiods of time stipulated in the Contract, after due allowance <strong>for</strong> any extension oftime which may be granted under the provisions set <strong>for</strong>th hereinafter, theContractor shall pay to the Board Liquidated Damages <strong>for</strong> 'each" day of default.The amount of the Liquidated Damages shall be assessed at the rate of 0.10percent of total contract price <strong>for</strong> each calendar day of default in completion of86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!