13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.0 CONTRACTOR'S DRAWINGS1.1 SHOP DRAWINGSEngineering data (both soft and hard copy) covering the manufacture of allequipment and fabricated materials specified hereunder shall be submitted to theBoard/Engineer <strong>for</strong> approval. These data shall include drawings and descriptivematerial in sufficient detail to show the type, size, arrangement, operation ofcomponent, materials, devices, the external connections, anchorage's, supportsrequired and any dimensions necessary <strong>for</strong> installation and co-ordination withrelated equipment. No work shall be per<strong>for</strong>med until the drawings and data havebeen approved.1.2 WORKING DRAWINGSThe Contract drawings (both soft and hard copy) shall show the arrangement,layout, existing equipment, method of control and the design of the, completion of<strong>power</strong> plant addition as specified herein.(1) The title of the drawing, the signature of the Contractor's responsibleengineer, the date prepared shall appear in the bottom right hand corner of thedrawing. The size of drawings shall be as follows:AOAlA2A3A4841 mm x 1,188 mm594 mm x 840 mm420 mm x 594 mm297 mm x 420 mm210 mm x 297 mm(2) The Contractor shall submit <strong>for</strong> approval checked arrangement and detaileddrawings of all parts, schematic and wiring diagrams and description ofequipment to demonstrate that the equipment to be furnished will con<strong>for</strong>m tothe requirements and intent of the Specifications.The arrangement drawings shall show overall dimensions, clearance heights<strong>for</strong> the equipment, weight, description and location of all accessories.Schematic diagrams shall indicate the operation and function of all electricalequipment, accompanied, where necessary, with explanatory notes.(3) The Contractor shall submit installation drawings <strong>for</strong> approval includingembedded Piping, piping details, support <strong>for</strong> pipings, conduits and fittings,cable laying, cable rack fixing and other detailed drawings <strong>for</strong> installationwork.(4) The following types of drawings shall be submitted <strong>for</strong> approval immediatelyon completion of design:106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!