13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ha(W) = Ha 100% x 0.8 + Ha 75% x 0.1 + Ha 50% x 0.1The increased heat rate is calculated as follows:h (%) = Ha(W) - 1.01 x Hg(W) X 100Hg(W)30.3 Trans<strong>for</strong>mer lossIf the losses in respect to each step-up trans<strong>for</strong>mers calculated by the result ofthe shop tests exceed the guaranteed value with the tolerance, the Contractor shall pay tothe BOARD a liquidated damage an amount conducted by the following <strong>for</strong>mula inBangladesh Taka.X = a(Na - 1.01 x Ng) + b(La - 1.01 x Lg)Where: x : Liquidated damage in Bangladesh Takaa : TK. 57,000 /kWNa : No load loss to be tested at shopNg : No load loss to be guaranteedb : TK. 25,650 /kWLa : Load loss to be tested at shopLg : Load loss to be guaranteedIn the application of the calculation <strong>for</strong>mula above, if the results become a minus (-) theBOARD shall not be liable to Pay the Contractor such value.-----------------------------------------------------------------------------------------------120

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!