- Page 1 and 2:
BANGLADESH POWER DEVELOPMENT BOARDT
- Page 3 and 4:
14. Name and address ofthe Office f
- Page 5 and 6:
Bangladesh Power Development BoardC
- Page 7 and 8:
32.01 Termination for Convenience -
- Page 9 and 10:
27.1 Service Engineers After Warran
- Page 11 and 12:
Rejection of TendersThe Tender shal
- Page 13 and 14:
a) Volume 1 Chapter 1: Instruction
- Page 15 and 16:
to establish the Tenderer's minimum
- Page 17 and 18:
10.0 INFORMATION TO BE SUPPLIED WIT
- Page 19 and 20:
xix)xx)xxi)A list of plant equipmen
- Page 21 and 22:
v) The Tenderer may submit cost sav
- Page 23 and 24:
Specifications of the equipment/mat
- Page 25 and 26:
(vi) Am = First cost in Taka= A + C
- Page 27 and 28:
the contract conditions. The Perfor
- Page 29 and 30:
(2) Any effort by a Tenderer to inf
- Page 31 and 32:
APPENDIX-2FORM OF TENDER(SPECIMEN)S
- Page 33 and 34:
Appendix-3Bill of Materials/Quantit
- Page 35 and 36:
Sl. No Item Name QtyA1.5COUPLINGFle
- Page 37 and 38:
Sl. No Item Name QtyA2.1.2hallPipin
- Page 39 and 40:
Sl. No Item Name Qtyengine hallLubr
- Page 41 and 42:
Sl. No Item Name QtyExhaust gas boi
- Page 43 and 44:
Sl. No Item Name QtyA4.1.8 Suspensi
- Page 45 and 46:
Sl. No Item Name Qty- UPS for unit
- Page 47 and 48:
Schedule-2Erection & CommissioningS
- Page 49 and 50:
Sl No Description QtyUtility block
- Page 51 and 52:
Sl No Description QtyEarthworks and
- Page 53 and 54:
Sl No Description Qty3F3GSITE WORKS
- Page 55 and 56:
Schedule-5Long Term Service Agreeme
- Page 57 and 58:
APPENDIX-4TIME SCHEDULEManufacture,
- Page 59 and 60:
Our liability under this guarantee
- Page 61 and 62:
eference made a part thereof. This
- Page 63 and 64:
Appendix-7COMPLAINTS AND APPEALSIn
- Page 65 and 66:
1.0 CONTRACT DOCUMENTSCHAPTER II :
- Page 67 and 68:
xiv)xv)xvi)xvii)xviii)xix)xx)xxi)xx
- Page 69 and 70: commissioning including all other w
- Page 71 and 72: suitable access for equipment and m
- Page 73 and 74: The Engineer's decision and the fil
- Page 75 and 76: shall not be again employed upon th
- Page 77 and 78: (b)(c)(d)The right of the Board to
- Page 79 and 80: of the Contractor, afford all avail
- Page 81 and 82: 32.0 RIGHT OF BOARD TO TERMINATE CO
- Page 83 and 84: Contractor's control to be intimate
- Page 85 and 86: The Contractor shall comply with su
- Page 87 and 88: initial commercial operation (ICO)
- Page 89 and 90: 49.0 CLEAN UP OF SITEThe Contractor
- Page 91 and 92: on account of failure to achieve gu
- Page 93 and 94: employees or any of the employees o
- Page 95 and 96: eplacement of any materials lost or
- Page 97 and 98: portion of such payment. Any sum re
- Page 99 and 100: 2. Engineer 1 Copy3. Director, Dte.
- Page 101 and 102: Each part of the equipment which is
- Page 103 and 104: the practical arrangements he is of
- Page 105 and 106: Chapter IIISpecial Conditions105
- Page 107 and 108: a. The drawings showing the arrange
- Page 109 and 110: The Contractor shall erect temporar
- Page 111 and 112: The Contractor shall be responsible
- Page 113 and 114: The Contractor shall ensure that no
- Page 115 and 116: 19.0 FIRE PROTECTIONOnly constructi
- Page 117 and 118: actions of the Board or the employe
- Page 119: 29.0 OPEPATING AND MAINTENANCE INST