13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

63.0 REPORTING, CLEARING AND SHIPPING DOCUMENTSThe contractor shall be taken prior written permission from the ProjectDirector/Board/Engineer be<strong>for</strong>e shipment of any equipment & materials <strong>for</strong> theproject.The Contractor shall provide all official <strong>for</strong>ms and <strong>document</strong>al in<strong>for</strong>mationas shall be needed to satisfy the requirements of Bangladesh Customs and theBoard.63.01 REPORTING DOCUMENTSThe Contractor shall <strong>for</strong>ward to the Project Director, Gopalganj 100 MW±15%Power Plant (HFO fired Engine Generating Sets) Project, Bangladesh PowerDevelopment Board, ........................., Bangladesh, the following <strong>document</strong>s :a. Bill of Lading 1 Copyb. Shipping Specification 2 Copiesc. Quality Certificate 2 Copiesd. Packing Lists (One copy shall be placed inside the case, 2 Copiesthe other in a special packet in case No.1)e. Insurance Certificate 2 Copies63.02 CLEARING DOCUMENTSThe Contractor shall <strong>for</strong>ward to the Board through their bankers not later thanseven (7) days from the date of sailing <strong>for</strong> the purpose of clearing the cargo at thePoint of destination the following <strong>document</strong>sa. Negotiable copy of Bill of Lading 1 Copyb. Invoice with itemised prices 3 Copiesc. Shipping Specification 3 Copiesd. Copy of the Charter Party 1 Copy(If chartering has been permitted by prior arrangement with the Board)63.03 SHIPPING DOCUMENTSSimultaneously with the dispatch of the negotiable <strong>document</strong>s as listed in clause63.02 above the Contractor shall also send by Air Mail eleven (11) sets of nonnegotiableshipping <strong>document</strong>s <strong>for</strong> each shipment according to the followingdistribution list. Each set will comprise the following <strong>document</strong>s :1. Bill of Lading 1 Copy2. Invoice 1 Copy3. Shipping Specification 1 CopyThe invoices and shipping specifications shall bear the Insurance cover notenumber.1. Project Director.Gopalganj 100 MW±15% Power Plant(HFO fired Engine Generating Sets) ProjectBangladesh Power Development Board,................., Bangladesh2 Copies98

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!